BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Hermiston, Oregon. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; and transportation facility.

Major elements of work for the project include, but are not limited to, preparing, and providing the design, fabrication, and delivery of one (1) pre-engineered metal T-hangar building, including hangar building concrete slab and foundation design and all materials needed for the erection of the new T-hangar. This project also includes erection/construction of the new T-Hangar building and all related site improvements as shown on the project Drawings. The Bidder must agree that the requirements and conditions of employment be observed and minimum wage rates, as established by the U.S. Secretary of Labor, or the Oregon Bureau of Labor and Industries, including any appropriate amendments. The contractor shall pay the state or federal prevailing wage rate, whichever is higher, and adhere to the most stringent requirements under this contract. No bid for a construction contract shall be received or considered by the City of Hermiston unless the Bidder is registered with the Construction Contractors Board as required by ORS Chapter 701 or licensed by the State Landscape Contractors Board as required by ORS 671.530. Contractors must be qualified in accordance with ORS 279 and other applicable sections of the Oregon Revised Statutes in order to enter into a Contract with the Owner for public work in Oregon. For information concerning the proposed work, contact Tracy May, Precision Approach Engineering, Inc., telephone 541/754-0043. For an appointment to visit the site of the proposed work, contact Mark Morgan, Hermiston Municipal Airport, 1600 Airport Way, Hermiston, Oregon 97838, (503) 781-2199. The Engineer's cost opinion for this work is between $900,000 and $1,200,000 Bidder shall submit this form to City of Hermiston on or before 4:00 pm on February 29th, 2024, as their disclosure of first-tier subcontractors Set Aside(s) MBE (4%), WBE (7%), DBE (5%) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$898,362.00

Public - City

New Construction, Site Work

16

14

10

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
110
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

October 31, 2024

img_map_placeholder

1600 Airport Way, Hermiston, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.