BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2024 at 8:00 PM

Updated May 17, 2024

Site work for a water / sewer project in Hermiston, Oregon. Completed plans call for site work for a water / sewer project.

**As of May 16, 2024 this project has been awarded to Culbert Construction, Inc with an amount $1,856,174.58. ** Work will generally consist of the replacement of an existing water line, which is located beneath approximately 5,000 feet of paved right-of-way, with new ductile iron piping. Work will also include replacement of non-copper service lines, a grind and overlay of approximately 1,000 feet of roadway, and full street reconstruction of approximately 1,400 feet of roadway. Est. Value Notes: $1.6 to $1.8 Million The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law. The Owner is an equal opportunity employer. Minority and women-owned businesses are encouraged to bid. Minority and women-owned businesses should indicate they are a minority on the Plan holders List. Questions received less than seven days prior to the date for opening of Bids may not be answered. Question Deadline 03/12/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$1,856,175.00

Public - City

Site Work

42

44

8

9

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

May 20, 2024

Project location map

Multiple Locations, Hermiston, OR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.