BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 23, 2024 at 7:00 PM

Updated December 19, 2024

Renovation of an educational facility in Hastings, Michigan. Completed plans call for the renovation of a educational facility.

075000 - Roofing - 1. installation of storm windows or glazing panels over existing glazing, provided the storm window or glazing panel contains a low-emissivity coating. however, a low-emissivity coating is not required where the existing glazing already has a low-emissivity coating. installation may be either on the inside or outside of the existing glazing. 2. replacement of glazing in existing sash and frame, provided the u-factor and shgc will be equal to or lower than before the glass replacement. 3. alterations to roof or ceiling, wall, or floor cavities that are insulated to full depth with insulation having a minimum nominal value of r-3.0/in. 4. alterations to walls and floors, where the existing structure is without framing cavities and no new framing cavities are created. 5. roof recovering. 6. removal and replacement of a roof membrane where there is existing roof insulation integral to or below the roof deck. 7. removal and replacement of a roof membrane where the insulation is installed entirely above the roof deck, a minimum of r-20 insulation shall be permitted where the placement of additional insulation greater than r-20 insulation would require either of the following: a. raising the height of parapets, weep systems, or through wall flashings where roof abuts adjoining walls or parapets. b. raising the height of mechanical or electrical equipment, mechanical curbs, roof hatches, skylight curbs, service equipment, piping, conduit, duct work, roof platforms, ladders, stairs, guard rails, expansion joints, roof davits, or door thresholds. 8. replacement of existing fenestration, provided that the area of the replacement fenestration does not exceed 25% of the total fenestration area of an existing building and that the u-factor and shgc will be equal to or lower than before the fenestration replacement. Direct all inquiries to the construction manager. The project is non prevailing wage. Work shall begin on June 6, 2024 and shall be completed no later than August 19, 2024. Question Deadline 02/05/2024 at 12:00 PM ET The Owner is not responsible for a Bidder's interpretation of the Bid Division Descriptions. Bidders are encouraged to request information by calling or emailing the Project Manager: Jim Venton, Project Manager, Wolgast Corporation, (989) 790-9120, extension 1302 or jventon@wolgast.com. Addendum #1 has been issued as of 2-2-2024.

Award

Educational

$500,000.00

Public - City

Renovation

7

12

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
139
Bidding Soon
1,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

June 6, 2024

Project location map

232 W Grand St, Hastings, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.