BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Southgate, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.

The City of Southgate requires Suppliers to design a play system that meets or exceeds all current federal CPSC, ASTM, IPEMA standards and ADA requirements. The proposals shall include the costs of delivered play systems as designed, inclusive of the equipment structures, components, hardware, detailed technical installation instructions and maintenance & operations manuals from manufacturer. All equipment will be assembled and installed by the Supplier. The contractor will be responsible for the removal of the existing playground and ramp system as well as grading of the existing site. All dirt spoils shall be graded around site to eliminate the need for removing spoils from the site. A new sidewalk is to be included to connect the playground to the main sidewalk on McCann Street. A concrete curb containment system is to be included around the playground at a minimum of 6" in width and 18" in depth. Playground Suppliers shall provide a maximum of (2) two designs for each park playground and all supplied amenities. Reference Number 0000340448 The Parks and Recreation Department of the City of Southgate, Michigan desires to replace an existing play structure at McCann Park located on McCann Street between Eureka Road and Plum Street (approximately 15200 McCann Street). The proposal is to include all installation and playground equipment with appropriate engineered wood fiber surfacing. The City is seeking proposals in response to this Request for Proposals (RFP) from qualified recreation equipment design/build firm or team (Contractor) to produce a conceptual design, final design and construction documents and construction of a non-supervised public park. Suppliers should base their playground equipment designs on meeting all accessibility and safety standards as well as the guidelines & specifications listed in this RFP. Quality of equipment components, quality of design, play value, cost, and appropriateness to location and target demographic must be taken into consideration in the design of the play system. The contractor will be responsible for the removal of the existing playground and ramp system as well as grading of the existing site. All dirt spoils shall be graded around site to eliminate the need for removing spoils from the site. A new sidewalk is to be included to connect the playground to the main sidewalk on McCann Street. A concrete curb containment system is to be included around the playground at a minimum of 6" in width and 18" in depth. Question Deadline 01/30/2024 at 2:00 PM ET Questions are submitted online No, Refer questions to: Raymond Parker, Hennessey Engineers, Inc. Phone: (734) 759-1600 Fax: (734) 282-6566 E-Mail: rdparker@hengineers.com . Each proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Southgate, Michigan, in an amount not less than five percent (5%) of the total bid amount. The successful Supplier shall furnish approved Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the bid amount . Playground Installation to be completed by end of 2024 *The Owner reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 60 days after the date of the bid opening.

Post-Bid

Playgrounds / Parks / Athletic Fields

$145,700.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
104
Bidding Soon
1,519
All Active Projects
623
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

June 7, 2024

img_map_placeholder

McCann Ave, Southgate, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.