Published July 3, 2024 at 8:00 PM

Updated July 4, 2024

Site work and new construction of a civil project in West Valley City, Utah. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of July 3, 2024, 2024, project was awarded to Corrio Construction, Inc, awarded amount is $10,600,530.50.** The due date for the next phase of bidding is 5/23/24. The Short-List of Qualifying contractors is now available. Bidding should be complete end of May 2024. The Work for the Magna WRF Influent Project comprises of the construction of a new influent pump station with three screw pumps, expansion and modifications of the existing intermediate pump station with two new submersible pumps, replacement of grit pumps and chamber equipment, construction of a new grit washing building with two grit washers, and all associated structural, architectural, mechanical, instrumentation, control, electrical, and site work. The Work for the Magna WRF Influent Project includes the construction of a new influent pump station with three screw pumps, expansion and modifications of the existing intermediate pump station with two new submersible pumps, replacement of vortex grit pumps and chamber equipment, construction of a new grit washing building with two grit washers, and all associated structural, architectural, mechanical, instrumentation, control, electrical, and site work. These upgrades to the facility are needed to prevent hydraulic backups in the collection system, provide additional pumping capacity for future projected flows, replace aging equipment, and add redundancy. The Work generally includes the following elements: 1. New influent pump station (60 hp installed capacity). 2. New 1,510 sq-ft Grit Washing Building with a process room and electrical room. 3. Excavation with high groundwater (dewatering activities). 4. Expansion of existing intermediate pump station (maximum 50 hp installed capacity). 5. Installation of Owner pre-procured equipment (screw pumps and grit washing equipment). 6. Yard piping, utilities, and civil site improvements. 7. Electrical and controls. Notification of Pre-Qualified Contractors March 20, 2024 Questions regarding project scope and schedule shall be directed via email to the Engineer, by contacting: Stantec 2890 East Cottonwood Parkway Suite 300 Salt Lake City, UT 84121 Attention: Madison Bertoch, Project Engineer Email: madison.bertoch@stantec.com Phone: (801) 617-3311

Award

Water / Sewer

$10,600,531.00

Public - City

New Construction, Site Work

7

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
77
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

July 1, 2024

Project location map

7650 W 2100 S, West Valley City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.