Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2024 at 8:00 PM
Updated March 29, 2024
Site work and paving for a civil project in Monroe, Michigan. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
2024 Microsurfacing Bedford Drive Special Assessment District Any questions regarding this bid shall be directed to the person listed below: Name: Chloe Fults Phone: 734-240-5109 Email: CFults@mcrc-mi.org ITEMS OF WORK Following is a description of the items of work on this contract: Micro-Surface, Modified (Syd) - The Micro-Surface, Single Cse, Modified item of work shall be in accordance with section 504 of the Michigan Department of Transportation Standard Specifications for Construction. This item of work will be used for the application of two courses of 2FA mix to the pavement surface at a combined application rate of at least 30 pounds per square yard. Pavt Mrkg, Waterborne, 4 inch, White (Ft) and Pavt Mrkg, Waterborne, 4 inch, Yellow (Ft) - The Pavt Mrkg, Waterborne, 4 inch, White and Pavt Mrkg, Waterborne, 4 inch, Yellow items of work shall be in accordance with section 811 of the Michigan Department of Transportation Standard Specifications for Construction. This item of work will be used for the installation of the longitudinal permanent pavement markings. The Monroe County Road Commission will perform the layout of the permanent pavement markings. Witness, Log, Layout, Max $1,250.00 - The Witness, Log, Layout, Max $1,250.00 item of work shall be in accordance with section 811 of the Michigan Department of Transportation Standard Specifications for Construction. This item of work will be used to witness, log, and lay out the permanent pavement markings in kind. Rem Spec Mrkg (Sft) - The Rem Spec Mrkg item of work shall be in accordance with section 811 of the Michigan Department of Transportation Standard Specifications for Construction. This item of work will be used for the removal of the existing special pavement markings prior to the placement of the microsurfacing. Pavt Mrkg, Polyurea, ___ (Ea) - The Pavt Mrkg, Polyurea, ___ items of work shall be in accordance with section 811 of the Michigan Department of Transportation Standard Specifications for Construction. These items of work will be used to replace the special pavement markings after the microsurfacing is applied All bids must be in a sealed envelope and clearly marked Bid for 2024 Microsurfacing HMA Paving at Various Culverts TIME OF COMPLETION All work shall be completed on or before October 15, 2024
Award
Roads / Highways
$750,452.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2024
March 18, 2024
Multiple Locations, Monroe, MI
Related To This Project
Monroe, MI
Bid Date: Feb 15 2024
Monroe, MI
Bid Date: Feb 26 2024
Monroe, MI
Bid Date: Mar 01 2024
Monroe, MI
Bid Date: Apr 08 2024
Monroe, MI
Bid Date: Feb 15 2024
RFP D/B - Design and Construcion Administration Services for the Monroe Facility Expansion - 5285911
Monroe, MI
Bid Date: Feb 13 2024
Monroe, MI
Bid Date: Jan 25 2024
Monroe, MI
Bid Date: Feb 12 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
