BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Monroe, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

2024 Microsurfacing Bedford Drive Special Assessment District HMA Paving at Various Culverts 0.04 miles of hot mix asphalt resurfacing and aggregate base conditioning at Ida West Road over Stacy Drain, Secor Road over Bay Creek, and Samaria Road over Bay Creek in Bedford Township and Summerfield Township, Monroe County, Michigan. Any questions regarding this bid shall be directed to the person listed: Name: Choloe Fults Phone: (734) 240-5109 Email: cfults@mcrc-mi.org. 1. Fine grade and compact the 21AA aggregate base installed by the culvert installation contractor. The approximate length of the open cut at Ida West Road is 30 feet long. 2. Install 9 inches of hot mix asphalt in four (4) lifts consisting of: a. Wearing Course: 2 inch lift of MDOT 4EL or ODOT 448, Type 2 - 24 feet wide b. Leveling Course: 2 inch lift of MDOT 4EL or ODOT 448, Type 2 - 24 feet wide c. Base Courses: Two 2 1/2 inch lifts of MODT 3EL or ODOT 301 - 26 feet wide 3. Equivalent HMA mixtures may be substituted with prior approval from the Monroe County Road Commission. 4. The wearing course must be installed with a self-propelled paver. 5. Below is the existing typical cross section for Ida West Road.

Award

Bridges / Tunnels

$71,700.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
73
Bidding Soon
1,401
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Monroe, MI

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.