This is a service / maintenance or supply contract in Monroe, Michigan. Contact the soliciting agency for additional information.

Tree Removal and Clearing for the Monroe Loop Trail The County of Monroe is accepting proposals for tree removal and general clearing along the proposed route of the Monroe Loop Trail located in the City of Monroe, Frenchtown Charter Township and Monroe Charter Township in Monroe County. The successful contractor will be required to perform all services as outlined in the Scope of Work section of this Request for Proposal and shall include the costs for the project as outlined in their proposal response. The cost of all labor, material, equipment, tools, supervision, etc shall be included in your proposal cost pricing. The project may commence upon award of the contract once proposals are received, evaluated and a contractor selected. Please use the Proposal Form provided to submit your response. Scope of Work: a) Tree removal and clearing along the route and at locations as defined on the enclosed documents. Exact tree removal locations and clearing areas will be marked in the field by the County of Monroe (Owner) or their representative as agreed to at the preconstruction meeting. General locations of tree removals and clearing are shown on the plan sheets for reference. b) All permitting for this work from the Monroe County Road Commission and property owners along the route have been obtained by the Owner. The Contractor shall follow all conditions of the permit in each jurisdiction. c) All work not otherwise specified shall be done in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction. Within these specifications, all references to the Michigan Department of Transportation shall mean the County of Monroe (Owner). d) The Owner reserves the right to increase or decrease quantities from those originally estimated and such changes will be paid for at the unit price bid so long as the total contract amount is not changed more than twenty-five (25) percent. Changes in excess of that amount will be individually negotiated. e) The Contractor is responsible for protecting the life and health of all personnel on the project; the safety and health of the public; and property during the construction of the project in accordance with subsection 104.07.B of the Michigan Department of Transportation 2020 Standard Specifications for Construction. Prior to the commencement of work, the Contractor must submit a written "Construction Safety Program" that outlines the plan and procedures for preventing and mitigating accidents on the project and meeting all health and safety requirements of the contract. f) The Contractor shall be responsible for the protection of vehicular and pedestrian traffic, work in progress and construction workers in the work zone through the implementation of procedures as described in this proposal, the MMUTCD, the Standard Specifications for Construction, and other applicable state and federal requirements. Applicable standards when working in or near roadway right of ways may include 4400-M-NFW-SHL-MOB, 4401-M-NFW-SHL-2L, 4403-M-MFWSHL, 4405-M-NFW-SHL, among others as appropriate. This will be paid as Minor Traffic Devices and include all items required by the Owner. g) All work shall be conducted during normal daytime hours unless otherwise approved by the Engineer. Normal daytime hours are considered to be Monday through Saturday from 7 a.m. to 7 p.m. unless otherwise constrained by a local jurisdiction ordinance. h) For the protection of underground utilities, the contractor shall notify "Miss Dig" at 1-800-482-7171 or 811, a minimum of three working days, excluding weekends or holidays prior to excavating and otherwise fully comply with the provisions of Act 174 of 2013 and as amended. Miss Dig members will thus be routinely notified. This does not relieve the Contractor of the responsibility of notifying utility owners who may not be part of the Miss Dig system. i) The low Bidder for the work covered by this proposal will be required to meet with the Owner's representatives to review the Contractor's proposed work schedule. The schedule for this meeting will be set within one (1) week after the low bidder is determined and notified. The Owner's representative will arrange the time and place for the meeting. j) MEASUREMENT AND PAYMENT: The size of trees will be determined by the diameter of the trunk, measured to the nearest full inch, at a point 4.5 feet above the ground line at the base of the tree. All work shall be completed on or before May 17, 2024. The County of Monroe reserves the right to accept or to reject any and all proposals, to waive any irregularities and to make an award that is determined by the County of Monroe to be in the best interest of the County. Questions concerning the proposal submittal, award and administration of the contract should be directed to: Michael Bosanac 125 E. Second StreetMonroe, MI 48161 Telephone 734-240-7267 E-mail michael_bosanac@monroemi.org Time Period of Evaluation Selection of the contractor will be made as soon as possible after the closing date of receipt of proposals. However, proposals submitted shall remain valid for sixty (60) days after due date.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
81
Bidding Soon
1,481
All Active Projects
665
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2024

March 26, 2024

img_map_placeholder

N Monroe St, Monroe, MI


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.