Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work for a bridge / tunnel in Hartford, Vermont. Completed plans call for site work for a bridge / tunnel.

Per the owner, as of February 27, 2025, construction was completed in the fall of 2024 with a design-build alternative. Closed solicitation has been included below for reference. ............. The Town of Hartford is requesting proposals for professional engineering services related to desired improvements to the Wilder Bike Path Bridge. Bids must be submitted in a sealed envelope to the Hartford Town Manager's office, Hartford Town Hall (2nd floor), in a clearly marked envelope. Deadline to Submit Questions: 3:00 PM local E.S.T. on Monday February 5th, 2024. Each Consultant seeking consideration for performance of services related to the project must submit a Bid. Proposers are to submit one original copy signed by an officer authorized to bind the company, 1 copy and one digital copy in PDF format. The Town reserves the right to reject any or all bids, to waive any minor irregularities in a bid, to accept a part or parts of a bid unless otherwise restricted in this request for bids, to accept any bid which in the judgment of proper officials is deemed in the best interest of the Town, or issue to a subsequent request for bids. The Town also reserves the right to approve or reject any subcontractor proposed for work under this request. The Town reserves the right to select the successful proposer based on bids received without seeking further information or clarification from proposers. Upon review of Bids, the Town may designate the two most qualified bids as finalists. These finalists may be invited to make oral presentations and participate in a questionand-answer session with the Town. All federal, state, and local laws regarding competitive bidding, anti-competitive practices, and conflict of interest shall be applicable to this Request for Bids. The Town does not guarantee that any contract will be awarded because of this request. If a contract award is made but the contract is not executed, the Town does not guarantee that the contract will be re-awarded. The Town of Hartford owns and maintains Bridge 527 along the Wilder Bike Path. This 10'+- wide by 50'+- long Arched Pratt-Style Prefabricated Steel Truss Bridge constructed in 2001 has "weathered" steel floor beams, stringers, and safety rails with 4x12 timber decking set on concrete headwalls with wing walls. The stringers, beams and steel angles securing the deck planks are in very poor or failing condition. The town has recently closed the bridge and seeks to implement a timely plan to reopen it.

Occupancy

Bridges / Tunnels

$2,820,000.00

Public - City

Site Work

65

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
139
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

Project location map

To Be Determined, Hartford, VT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed