BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Charlottesville, Virginia. Completed plans call for the renovation of a educational facility.

**As of March 08, 2024, this project has been awarded to Snows General Merchandise Inc., awarded amount not available.** Greer Elementary School Restroom Renovation- The project is generally described as removal of existing toilet partitions and salvage for reinstallation, and demolition of existing plumbing fixtures, demolition of existing floor tile, installation of new tile floor and wall finishes, installation of new plumbing fixtures, reinstallation of existing toilet partitions and installation of new toilet accessories. Scope of Work as described by the Plans and Specifications, other documents listed in the Specifications, and any addenda which may be issued, all of which request qualified bidders to submit competitive prices or bids for providing the described work on the project. The firm name given below is the true and complete name of the bidder and the bidder is legally qualified and licensed by the Commonwealth of Virginia, Department of Commerce, State Board for Contractors, to perform all Work included in the scope of the Contract. The project is generally described as finish and fixture replacements in several restrooms at Greer Elementary School. All responses to questions will be made by Final Addendum 2/16/2024. The deadline for questions is 2/14/2024 at 2:00pm. Email Form To: County of Albemarle Purchasing - Chris Beahm - cbeahm@albemarle.org ACPS Project Manager - April Newton - anewton@k12.albemarle.org Quinn Evans Architects - Luis Gomez - luis.gomez@quinnevans.com The undersigned understands that time is of the essence and agrees that the date for Substantial Completion of the entire project shall be on or before August 2,2024 based on a Notice authorizing Work to proceed on or before April 26, 2024 , with construction to begin on site June 8, 2024, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E. Procedures for submitting a bid, claiming an error, withdrawal of bids, and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330A (i), Code of Virginia. The Owner reserves the right to reject any or all bids. The County of Albemarle does not discriminate on the basis of race, religion, color, sex, national origin, age or disability, or against faith-based organizations as defined under the Virginia Public Procurement Act on the basis of such organization's religious or charitable character. Bid Bond payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid. A Bid Bond may be required for projects having bids of less than one hundred thousand dollars ($100,000) if such requirement is stated in the Notice of Invitation for Bids. The Owner reserves the right to cancel the Invitation for Bids, to reject any and all bids at its sole discretion when such rejection is in the interest of the Owner, or to reject the bid of any bidder who is determined to be not responsive or not responsible. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated construction cost range for this project is $100K-$500K. Substantial Completion of the entire project shall be on or before August 2,2024 ; Contractor shall achieve Final Completion within thirty (30) days after the date of Substantial Completion. the scope of this project includes in-kind replacement of toilet accessories and plumbing fixtures, installation of new wall and floor tiles, and re-use of existing toilet compartments in restrooms at mary carr greer elementary elementary school. where existing room dimensions and fixture locations and spacing allow, adaag and icc/ansi are met. the intent of this project is not a complete restroom replacement nor a comprehensive building-wide analysis of code/adaag compliance.

Award

Educational

$500,000.00

Public - County

Renovation

5

15

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
39
Bidding Soon
1,133
All Active Projects
471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

June 8, 2024

img_map_placeholder

190 Lambs Ln, Charlottesville, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.