Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 22, 2024 at 8:00 PM

Updated March 26, 2024

Site work and paving for a mixed-use development in Gatlinburg, Tennessee. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project site is in Great Smoky Mountains National Park and is outside Gatlinburg, TN. The trailhead is seven miles southwest of Gatlinburg along Fighting Creek Gap Road. Access to the trailhead is via Fighting Creek Gap Road. From the trailhead to Laurel Falls, the transportation of construction equipment and building materials will take extra coordination and is limited to equipment that can navigate the existing approximately 5¿ wide asphalt trail. Site access issues will be identified in Division 1 specs. The project will have limited staging located near the trailhead and along Laurel Falls Trail. The trail will be closed for the duration of construction activities. The Park and Fighting Creek Gap Road will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor and operations impact. The new improvements will be constructed in an area considered a natural resource and protective measures are required to ensure the surrounding natural areas remain undisturbed and all construction activities remain within project site boundaries identified in the Construction Documents. This project includes new and rehabilitated parking areas along the Fighting Creek Gap Road between the Elkmont Campground Entrance Road and Maloney Point. Work includes removing the existing surface, rehabilitating existing parking areas, and constructing new parking areas. New retaining walls will be installed to allow for the new parking areas.. Estimated Period of Performance: The total anticipated period of performance is 540 days after Notice to Proceed. The Offeror may submit any questions with regard to this report by email to NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days. Estimated Price Range: Construction magnitude is $5,000,000 to $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project will rehabilitate the Laurel Falls trail. Work includes demolition and removing the existing surface, rehabilitating the trail foundation, and widening the trail where required. Retaining walls will be rehabilitated and culverts replaced.

Post-Bid

Playgrounds / Parks / Athletic Fields

$10,000,000.00

Public - Federal

Paving, Site Work

269

22

302

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
95
Bidding Soon
1,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

May 1, 2024

Project location map

Fighting Creek Gap Rd, Gatlinburg, TN


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed