BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Schiller Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project awarded to Brothers Asphalt Paving, Inc. in the amount of $2,824,476.19. City/County : Schiller Park Resurfacing of Various Roadways With the Following Quantities: 17,420 Ft Comb. C/g R&r, 38,007 Sf 5" Pcc Sidewalk R&r, 628 Sy 7" Pcc Driveway R&r, 50,571 Hma Surface Removal (Variable Depth), 308 Sf Detectable Warning, 3,865 Sy Class 'd' Patch, 4", 3347 Tons Hma Binder Course, Il-9.5, N50, 4,956 Tons Hma Surface Course, Il-9.5, Mix 'd', N50, 4,957 Sy Incidental Hma Surface Removal, 11,116 Ft Thermoplastic Pavement Marking, 11,025 Sy Topsoil and Sod, 119 Structure Adj., 575 Ft Storm Sewer, and 12 New Drainage Structures Project Location: Various Locations in the Village of Schiller Park Prequalification of Bidders. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Resurfacing of Various Roadways - 23-00090-00-RS

Award

Roads / Highways

$2,824,476.00

Public - City

Paving, Site Work

59

6

2

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
91
Bidding Soon
1,917
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

March 7, 2024

img_map_placeholder

Multiple Locations, Schiller Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.