BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Mulberry, Arkansas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Construction of improvements to the Mulberry Water Treatment Plant including replacement of existing raw water pumps, installation of a new raw water distribution structure and raw water meter vault, construction of a new solids contact clarifier and replacement of the existing solids contact clarifier mechanism, construction of at least one (1) new filter, upgrades to the existing filters, installation of a redundant backwash pump, construction of a new finished water flow meter and control valve vault, construction of a new 500,000 gallon precast prestressed reinforced concrete clearwell, site preparation, site piping, site restoration and other related improvements as shown on the Construction Plans and described in these Specifications. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$460,000.00

Public - City

Renovation, Site Work

180

35

25

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
56
Bidding Soon
675
All Active Projects
314
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 29, 2024

April 1, 2024

June 25, 2025

img_map_placeholder

7401 T J House Rd, Mulberry, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.