BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2024 at 8:00 PM

Updated June 15, 2024

Site work, paving and outdoor lighting for a mixed-use development in National City, California. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The general scope of work is to construct minor landscape grading, pathways, pavements, pedestrian safety, utility, shade structures, splash pad play area, adult fitness area, fencing, landscape drainage, park lighting, communications, irrigation, planting, and park maintenance. Specific improvements will include site demolition, construction of curb ramps, cast-in-place concrete structures, walls and footings, porous concrete paving, aggregate base, grading, drainage improvements, signage, pavement markings, splash pad play features and filtration system, fitness equipment structures, wood and metal fencing and gates, park lighting, security, landscaping, and irrigation systems. Ancillary work will include mobilization, traffic control during construction, utility coordination, water pollution control, and construction surveying.

Bid Results

Playgrounds / Parks / Athletic Fields

$7,683,001.00

Public - City

Outdoor Lighting, Paving, Site Work

81

15

40

5

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
88
Bidding Soon
1,129
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

August 12, 2024

Project location map

2005 E 4th St, National City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.