Published October 24, 2024 at 8:00 PM

Updated October 26, 2024

Site work for a water / sewer project in Olathe, Kansas. Completed plans call for site work for a water / sewer project.

The project includes the design and construction of nearly 2.5 miles of gravity sanitary sewer interceptor (estimated 30" to 54") from the City's existing 159th Street lift station to Dennis Avenue near the entrance to the City's Lake Olathe park. Another branch from this interceptor will connect to the City's existing Cedar Lake lift station (roughly 1 mile). The construction of both interceptors will allow for the decommissioning of both lift stations. At the north end of the main interceptor, a large regional lift station (12 to 16 MGD) will be constructed, and all flows will be pumped through a new force main from the lift station at Dennis Avenue all the way to the City's Cedar Creek Wastewater Treatment Plant located on 119th Street west of Clare Road. This phase will include the following scopes of work: erosion control, tree clearing, sitework, and blasting. All questions are due by Friday, October 18, 2024 at 5:00pm and should be directed as follows: Ryan Adler at radier@heavycontractors.com Brandon Bentley at bbentiey@heavycontractors.com Bid Package Notes 01 - SWPPP 02 - Sitework 03 - Tree Clearing 04 - Pre-Blast Survey

Post-Bid

Water / Sewer

$24,612,000.00

Public - City

Site Work

53

9

4

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
95
Bidding Soon
1,218
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

January 1, 2025

Project location map

W Cedar St, Olathe, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.