Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Renovation of a water / sewer project in Auburn, California. Completed plans call for the renovation of a water / sewer project.
Project Description: in Accordance With Plans and Specifications Prepared by Hdr Engineers Inc., the Work Includes the Furnishing of All Labor, Materials, Tax, Equipment and Services for the Construction and Completion of the New 2 Mgd (Expandable to 3 Mgd) Colfax Water Treatment Plant. The Main Features of the Water Treatment Plant Include Ballasted Clarification and Tri-media Filtration Package Treatment Systems Located Inside a Concrete Masonry Unit (Cmu) Treatment Building. Other Features Include Concrete Washwater Recovery Basin, Filter-to-waste Recovery Basin, and Clearwell, Concrete Solids Drying Beds, Bulk Chemical Tanks in a Concrete Containment, Chemical Metering Pumps Located Inside the Treatment Building, and Backwash and Booster Pump Stations Located Inside a Cmu Pump Building. Location 144 Ferguson Road, Auburn, CA 95603 The estimated cost of construction is $28,600,000. The total Contract Time to achieve Final Completion is 913 calendar days. A Bid Guaranty in an Amount Not Less Than Ten Percent (10%) of the Total Aggregate of the Bid, Including All Additive and/or Alternate Bid Items Shall Accompany Each Bid. This Bid Guaranty is To Be Forfeited Should the Bidder, if Awarded the Contract, Fail to Enter Into the Same, or Fails to Furnish the Bonds and/or Proof of Insurance as Stipulated in the Contract Documents. The Checks Or Bond Shall Be Made Payable to the Owner. The Successful Bidder Will Be Required to Furnish Both a Faithful Performance Bond in the Amount Of One Hundred Percent (100%) and a Payment Bond in the Amount of One Hundred Percent (100%) of the Contract Price. Written questions regarding the Contract Documents and/or the proposed Work should be sent to Douglas York, P.E., Associate Engineer by e-mail only at dyork@pcwa.net no later than January 29, 2025 at 5:00 p.m. All emails shall require verification of receipt by sender in accordance with the Instructions to Bidders.
Bid Results
Water / Sewer
$29,104,924.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2025
May 2, 2025
144 Ferguson Rd, Auburn, CA
Related To This Project
Auburn, CA
Bid Date: Mar 13 2024
Auburn, CA
Bid Date: Mar 05 2024
Auburn, CA
Bid Date: Mar 14 2024
Auburn, CA
--
Auburn, CA
Bid Date: Apr 01 2024
Auburn, CA
--
Auburn, CA
Bid Date: Mar 26 2024
Auburn, CA
Bid Date: Mar 26 2024
Auburn, CA
--
Auburn, CA
Bid Date: Sep 10 2024
Auburn, CA
--
Auburn, CA
--
Auburn, CA
Bid Date: Feb 23 2024
Auburn, CA
Bid Date: Jan 17 2024
Auburn, CA
Bid Date: Dec 28 2023
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
