Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published April 26, 2024 at 8:00 PM
Updated April 27, 2024
Renovation of a water / sewer project in Auburn, California. Completed plans call for the renovation of a water / sewer project.
During routine inspections, a hole was discovered on the casting of the bowl assembly for Pump 6 (ATP-2-P1601). Agency staff has identified the bowl assembly is in need of replacement, and requires contractor's assistance to perform the removal of column pipe and shaft, replacement of the bowl assembly, and reinstallation of column. The work consists of the following: Removal of the existing ATPS-2 Pump 6 including the column pipe, shaft, and all other appurtenances. Agency staff will remove the pump motor in advance of contractor mobilization of equipment. Inspection of all line shafts for straightness and all other pump components for damage. Repair any damage discovered during pump inspections (excluding pump bowl assembly). Furnishing of new pump bowl assembly. Installation of new bowl assembly, pump screen, line shafts, column pipe, and all other appurtenances to refurbish in its entirety ATPS-2 Pump 6. Agency staff will reinstall motor following pump and shaft installation. The work includes the furnishing of all labor, materials, taxes, incidentals and equipment necessary for completion of this project. Written questions regarding the Request for Quotes and/or proposed work should be directed to Heather Knutson, Engineering Services Manager by phone at 530-823-4951 or email at hknutson@pcwa.net no later than Friday, March 1st, 2024 at 5:00 pm. PROJECT LOCATION: Ophir Pump Station, 10715 Ophir Road, Auburn, CA 95603
Award
Water / Sewer
$280,198.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2024
April 15, 2024
10715 Ophir Rd, Auburn, CA
Related To This Project
Auburn, CA
--
Auburn, CA
Bid Date: Apr 01 2024
Auburn, CA
Bid Date: Mar 26 2024
Auburn, CA
Bid Date: Mar 26 2024
Auburn, CA
Bid Date: Jan 03 2025
Auburn, CA
Bid Date: May 31 2024
Auburn, CA
Bid Date: Mar 05 2024
Auburn, CA
Bid Date: Mar 13 2024
Auburn, CA
Bid Date: Mar 07 2025
Auburn, CA
--
Auburn, CA
Bid Date: Sep 10 2024
Auburn, CA
--
Auburn, CA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed