BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pensacola Beach, Florida. Contact the soliciting agency for additional information.

t is the intent and purpose of this document to provide for the seal coating of the existing asphalt multi-purpose path, located on Gulf Blvd. Navarre Fl, Santa Rosa County. The contractor is to perform all work as indicated, complete in place including all necessary labor, equipment, tools, materials, and all other related items for the proposed project. Project shall consist of seal coating approximately 18,700 LF (3.5 miles) and 10 feet wide of existing asphalt multi-purpose path utilizing coal tar emulsion, meeting all federal specifications RP-355e. It is the intent of the contract documents to describe to the contractor the complete work to be performed under this contract, and to briefly set forth the minimum requirements for materials, equipment, labor, and workmanship which are considered essential to achieve the desired product which are compatible with accepted standards for this type of work. It is also the intent of the contract documents to define the scope and quality of work to complete the project. The contractor shall clearly understand, and agree, that all items of work required for the for the project shall be completed in a workmanlike manner by skilled and competent tradesmen. Project covers approximately 18,700 LF (3.5 miles), 10 feet wide of existing asphalt multi-purpose path utilizing coal tar emulsion, meeting all federal specifications RP-355e. The contractor shall follow all instructions for handling and disposal of the product as set forth by the manufacturer, product safety data sheets, and all applicable standards as set forth by the EPA for this type of work. Preparation of surface, the existing asphalt is in various conditions; the entire paved surface shall be cleaned with brooms and power blowers removing all dirt, water, oil and foreign materials. All places where weeds appear shall be sterilized with a water soil sterilant. Holes will be cut out to the base and squared off and repaired with asphalt. Cracks 1/4 " wide and smaller shall be cleaned out, dried with compressed air, and filled with trowel grade crack filler. There are approximately 11 street crossings and 132 driveways. The contractor will coordinate with the Navarre Beach representative and clearly advertise where & when work will be performed, any closings and how residents will access their properties. Communications, the contractor will be in daily contact with the County's designated representative for the project, the use of signs, barricades, electronic message boards and the county Public Information Office will be used to keep the public informed as to when & where work will be performed. The county will be given a 48 hr notice before any work is to be performed. Maintenance of Traffic (Traffic Control) will be the responsibility of the contractor and will be in accordance with the most current edition of the FDOT Standards Specifications for Road & Bridge Construction. The contractor will follow all the selected manufacturer's instructions during preparation, and post application. The contractor shall take all necessary steps to protect all curbs, walkways, driveways, fencing, sand, and anything that is not to be sealed, and remove any coating from surfaces not requiring sealant. Santa Rosa County Board of County Commissioners encourages all segments of the business community to participate in its procurement opportunities, including small businesses, minority/women owned businesses, and disadvantaged business enterprises. The Board does not discriminate on the basis of race, color, religion, national origin, disability, sex, or age in the administration of contracts. Each bid shall be accompanied by a certified cashier's check, or bid bond, in the amount of 5% of the total bid price, payable to Santa Rosa County, as the guarantee that the respondent, if the bid is accepted, will promptly execute the Agreement. The respondent shall guarantee the total bid price for a period of 60 days from the date of the bid opening. Question Deadline 02/20/2024 at 12:00 PM CT Questions concerning this request should be submitted through electronically. The Board of County Commissioners reserves the right to waive irregularities in bids, to reject any or all bids with or without cause, and to award the bid that it determines to be in the best interest of Santa Rosa County.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
28
Bidding Soon
490
All Active Projects
230
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 27, 2024

img_map_placeholder

Gulf Blvd, Pensacola Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.