Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a pre-engineered storage facility in Bridgeport, Washington. Completed plans call for the construction of a 25,200-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.
Scope of Work: The Colville Tribal Fish Hatchery seeks the services of a licensed general contractor to prepare site, bring in necessary electrical for operations (lighting, outlets, heater/air conditioner) and construct a 30'x 60'x 14' Storage Building. As stated previously, no professional construction designs for the storage building have been completed. The storage building should be constructed in a similar fashion and color (body and trim) as the two other insulated, metal/wood framed buildings on site. Approximately 3/4 of this building will be used to store boats and equipment. A framed in, insulated, 18'W x 30' room will be constructed at the NE corner of the building. This room will have a standard size man door installed at the NE corner and an automatic 8'W x 10'H roll up garage door installed 5-foot from the NE corner. Two 12' x 12' automatic roll up doors will be installed at the front side of the building, as well as a standard sized man door. General Notes: 1. Walls a. 6 Inch Thick B. Insulated to R-21 or Greater 2. Ceilings a. Insulated to R-58 or Greater 3. Interior Floors a. 4 Inches of Concrete-smooth Finish B. Steel Reinforcement 4. Exterior Slabs a. 10 Foot Continous Concrete Apron Installed in Front of Garage Doors (Approx. 45 Foot by 10 Foot Area) I. 4 Inches of Concrete-broom Finish Ii. Steel Reinforcement Iii. Graded/sloped From Garage Slab 5. Garage Doors - 3 Total a. Two - 12 Foot by 12 Foot B. One -- 8-foot-wide by 10 Foot-height C. Commercial Insulated D. Include Electric Openers 6. Standard Doors -- 2 Total a. 6 Foot -- 8-inch-tall by 3 Foot Wide B. Commercial Steel Insulated C. External Door Hardware to Be Keyed Identical D. One Rh Outswing and One Lh Outswing 7. Exterior Gutters Affixed to Front of Building W/downspout a. Gutter and Downspout to Match Trim 8. Exterior Walls a. 29 Ga Prefinished Metal Siding Over 7/16" Osb 9. Interior Walls a. 2x6 @ 16 Inches O.c. With 5/8 Inch Gb Each Side 10. Roof a. 29 Ga. Pre-finished Metal Roofing Over 5/8 Inch Osb B. Sheathing to Be Fasten to Framing With Screws W/neoprene Washers C. Snow Guards to Be Affixed to Roof 11. Framing a. All Framing Material Will Be Douglas Fir No 2 or Better B. Wood in Contact With Earth and/or Concrete Shall Be Pressure Treated 12. Electrical a. Service I. Coordinate With Nespelem Valley Electrict (Utility) to Have Licensed Electrician Bring in Service Ii. Licensed Electrician to Install Transformer/panel Needed for Servicing Storage Building 1. Utility to Install Meter B. Building I. 110v Outlets Per Industry Standards Ii. Interior Lighting Fixtures Per Industry Standards 1. Lighting Will Be Led (High Bay Lighting) Iii. Exterior Lighting -- 4 Total 1. Led Wallpack W/photocell 120v 2. Manufcturer- Atlas, Lithonia or Comparable High Lumen, Long Life (50,000 Hours+) 13. Heating/cooling a. Electric Wall Heater(S) I. Heaters to Be Mounted in Corner(S) of Main Building Ii. Sized to Accommodate Space (1260 Ft3) -- Maintain Room to a Minimum of 50f in Winter Iii. Thermostat(S) to Be Mounted on Finished Wall B. Air Conditioner -- Total One I. Mounted in Enclosed 18 Foot by 30 Foot Room Ii. Wall Mounted With Remote Control Iii. Sized to Cool a Minimum of 540 Ft3 14. Finish Site-crusted Rock Gravels a. Site to Be Finished With 2 Inch Depth of Crushed Rock Gravels 8 to 10 Feet From Finished Building 15. Contractor to Provide Design, Manuals and Manufactures Specifications on Any Equipment, Lighting and Materials Installed Special Notes: 1. Design Loads a. Ceiling Load: 5 Psf B. Roof Snowload: 35 Psf C. Wind Speed: 85mph, Exp C D. Seismic Zone; C E. Damage From Weathering: Severe F. Damage From Decay or Termite: Slight to Moderate G. Soil Bearing: 2000 Psf Deadline for Questions: 5:30 PM (PST) on March 14, 2024 Answers Posted by: 5:30 PM (PST) on March 21, 2024 Description of Proposals Sought: The Colville Tribes Resident Fish Hatchery (Hatchery), located at 79 Tribal Hatchery Rd., Bridgeport, Wa., 98813, is seeking proposals from experienced construction businesses to build an engineered designed 30-foot (wide) by 60-foot (length) by 14-foot (height) insulated, metal, storage building. The contractor will manage the construction project from start to finish with coordination from a technical representative appointed by the Colville Tribe. The Hatchery does not have engineered designs available, but has provided a hand drawn conceptual design of the storage building they seek to have constructed. Businesses or manufactures of steel buildings may provide an engineered design with their products, to save on engineering costs, the Hatchery prefers this option. Additional details can be found within the Statement of Work. Since Federal funds will be used to complete this project, Davis Bacon Wages (Okanogan County) apply and Certified Payroll is required. The Confederated Tribes of the Colville Reservation is a Sovereign Nation. Presidential Executive Order established the Colville Indian Reservation in 1872, with a land base of 1.4 million aces, located in North Central Washington State. The Tribes Indian Country now includes various off-reservation trust land holdings. The Tribes administrative Headquarters are located at the Colville Indian Agency Campus, approximately 2 miles south of Nespelem, WA with offices located throughout our reservation. Tribal business hours are Monday thru Thursday 7:00 and 5:30 p.m. excluding Fridays, Saturdays, Sundays, Tribal and Federal holidays. All proposals and accompanying documentation will become the property of the Tribes and will not be returned. Contractors accept all risk of late delivery of emailed proposal regardless of fault. Emailed proposals should be sent to jill.phillips@colvilletribes.com. Confirmation will be sent upon receipt of each electronic proposal. Question Deadline 03/14/2024 at 5:30 PM PT. Questions Regarding the RFP Requests for interpretation/clarification of this RFP must be emailed to jill.phillips@colvilletribes.com Unauthorized contact with other tribal employees regarding this RFP may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. All responses will be posted electronically no later than 5.30 p.m. on March 21, 2024. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes.
Post-Bid
Warehouse / Distribution - Pre-Engineered Storage Building
$3,000,000.00
Public - Federal
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
May 27, 2024
79 Tribal Hatchery Rd, Bridgeport, WA
Related To This Project
Bridgeport, WA
Bid Date: Mar 08 2024
Bridgeport, WA
--
Bridgeport, WA
Bid Date: May 03 2024
Bridgeport, WA
Bid Date: Apr 12 2024
Bridgeport, WA
Bid Date: May 17 2024
Bridgeport, WA
Bid Date: May 10 2024
Bridgeport, WA
Bid Date: May 21 2024
Bridgeport, WA
--
Bridgeport, WA
--
Bridgeport, WA
Bid Date: Jan 24 2024
Bridgeport, WA
Bid Date: Nov 22 2023
Bridgeport, WA
Bid Date: Mar 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.