BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Bridgeport, Washington. Completed plans call for the renovation of a municipal facility.

The Confederated Tribes of the Colville Reservation is a Sovereign Nation. Presidential Executive Order established the Colville Indian Reservation in 1872, with a land base of 1.4 million aces, located in North Central Washington State and additional off-reservation trust lands. The Administrative Headquarters are located at the Colville Indian Agency Campus, approximately 2 miles south of Nespelem, WA with offices located throughout our reservation. Our business hours are Monday thru Thursday 7:00 and 5:30 p.m. excluding Friday, Saturdays, Sundays, Tribal and Federal holidays. Deadline for Questions: April 5, 2024 Final Answers Posted: April 8, 2024 Cut, frame, trim and paint all building openings required for installation. Provide and install 1-greenheck fan, motorized damper, and exhaust louver. Provide and install 2-motorized 22x20 intake louver/damper. Provide and install all electrical wiring, rigid conduit, 20-amp breaker switch, line voltage cooling thermostat as needed to power the system. Start and verify correct operation. Requests for interpretation/clarification of this RFP must be emailed to Matthew McDaniel at Matthew.McDaniel.FNW@colvilletribes.com. Unauthorized contact with other tribal employees or through any method other than email regarding this RFP may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. All questions must be submitted no later than 3:00 p.m., April 5, 2024, PST The CTCR reserves the right to reject any and all proposals, whether or not within applicable cost limits, and to waive any information in the proposals received, whenever such rejection or waiver is in the best interest of the CTCR. In the event of disagreement or grievances regarding contract, it is the CTCR policy to resolve all contractual issues per adopted Procurement Policy. Any contract let from this RFP shall be in effect upon the date of award and shall continue to be in effect until the termination of the Contract. It is anticipated that the Project will begin no earlier than May 1, 2024 and must be completed no later than July 31, 2024.

Post-Bid

Municipal

$500,000.00

Public - Federal

Renovation

3

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
72
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

May 1, 2024

img_map_placeholder

38 Half Sun Way, Bridgeport, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.