BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a civil project in East Liverpool, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

County: Columbiana Bridge Replacement (1 Bridge) C/r/s: Col-us 30-34.07 Completion Date: 10/31/2025 For Improving Various Sections in the City of East Liverpool, in Columbia County, of the State of Ohio, in Accordance With Plans and Specifications by Removing the Existing Reinforced Concrete Deck, Walk, Vandal Protection Fence, Abutment Backwalls, and Approach Slabs and Replacing With a New Raised Reinforced Concrete Deck, Walk, Vandal Protection Fence, and Semi-integral Abutments. Work Includes Fiber Wrap Deteriorated Sections of the Existing Piers, Minor Paving at Approaches, Lighting Upgrades, Guardrail Upgrades, and Other Related Work. OH DOT - US 30 - Bridge Replacement (1 Bridge)

Award

Bridges / Tunnels

$3,748,000.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

96

5

14

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
85
Bidding Soon
1,270
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 20, 2024

img_map_placeholder

US-30, East Liverpool, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.