Published April 18, 2024 at 8:00 PM

Updated April 20, 2024

Site work for a water / sewer project in Mill Creek, West Virginia. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Emergency High Service Line Replacement This project includes approximately 7,600 LF of 18 PVC C900 DR 14 water line, connections to existing system, gate valves, miscellaneous surface restoration, and all other necessary appurtenances for a complete and in-place installation. Any contract or contracts awarded under this advertisement for bids are expected to be funded in part by grants and loans from: the West Virginia Department of Environmental Protection State Revolving Fund. Neither the United States, the State of West Virginia nor any of their departments, agencies or employees are or will be a party to this invitation to bid or any resulting contract. No bid may be withdrawn for a period of ninety (90) days after the time of the opening of bids. Bid Security A Certified Check Made Out to the Owner, or a Bid Bond Executed by the Bidder and Bidder's Surety Company Approved by the Owner, in the Amount Equal to Five Percent (5%) of the Bid, Shall Be Submitted With Each Bid. No Bid Shall Be Waived or Returned Because the Bidder Failed to or Cannot Comply With Any Requirements as Set Forth in the Plans, Specifications, or Any Applicable Statues of the United States, the State of West Virginia, and/or Local Ordinance. Bidding Method The Bid Package Must Be Submitted in Two (2) Envelopes. The Envelopes Must Contain the Following: Envelope No. 1 A. Bid Bond B. Certification of Non-segregated Facilities C. Eeo Certification D. Certification of Receipt of Addenda to Plans and Specifications E. West Virginia Contractor's License Number F. Drug-free Workplace Affidavit G. Build America, Buy America Requirement H. Disadvantaged Business Enterprise Certification Envelope No. 2 I. Bid Form Contractor's License All Bidders Are Required to Have a West Virginia Contractor's License Per Section Section 30-42-12 of the West Virginia Code. West Virginia Alcohol and Drug Free Workplace Act West Virginia Code 21-1d-5 Provides That Any Solicitation for a Public Improvement Construction Contract Requires That Each Vendor That Submits a Bid for the Work to Submit at the Same Time an Affidavit of Compliance With the Bid. The Enclosed Drug Free Workplace Affidavit Must Be Signed and Submitted in the First Envelope as Evidence of the Vendor's Compliance With the Provisions of Article 1d, Chapter 21 of the West Virginia Code. Failure to Submit the Signed Drug Free Workplace Affidavit in the First Envelope Shall Result in Disqualification of Such Bid. Notice of Federal Wage Rates Contractors Are Required to Comply With All Federal Wage Rates Issued in Accordance With the Davis Bacon Act. The Contractor Will Be Required to Pay the Federal Wage Rates Appropriate for Each Worker Classification. Nondiscrimination in Employment Bidders on This Work Will Be Required to Comply With the President's Executive Order No. 11246. The Requirements for Bidders and Contractors Under This Order Are Explained in the Specifications. Suspension and Debarment Recipient Shall Not Entertain the Use of Businesses That Are Listed on the 'system for Award Management (Sam)' at Www.sam.gov in Accordance With 2 Cfr Part 1532 and Subpart B and C of 2 Cfr Part 180. Dbe Requirements Each Bidder Must Fully Comply With the Disadvantaged Business Enterprises, and Affirmative Action Requirements, as Identified in the Contract Documents. The Bidder Agrees to Make "good Faith Efforts" to Subcontract a Portion of the Total Value of the Contract to Disadvantaged Business Enterprises. This Shall Be Done in Compliance With the Six (6) Affirmative Steps as Outlined in 40 Cfr 33.240. Failure to Demonstrate Positive Efforts to Do So May Lead to Rejection of Bids. For This Program, the Term "subcontract" Includes All Construction, Service, and Modification Work Contracted for by the Bidder in the Execution of the Work Under This Contract. Contractor's Sales Tax Exemption The Huttonsville Public Service District is Exempt From West Virginia Sales Taxes and, by West Virginia Code Section 11-15-8d, Can Now Extend This Tax Exemption to Contractors Supplying Goods on Their Behalf. The Contractor Shall Coordinate With the (Town/psd) the Filing of Any and All Applications to the State of West Virginia, Exempting the Purchase of the Specified Goods From West Virginia Sales Tax and Hereby Agrees to Include the Savings From Such Sales Tax Exemption in Its Total Base Bid. Build America, Buy America Requirement P.l. 117-58, Infrastructure Investment and Jobs (Iija) Act, 2021 (Act), Includes a "build America, Buy America (Baba)" Requirement in Sections 70911 Through 70917 That Requires Clean Water State Revolving Loan Fund (Cwsrf) and Drinking Water State Revolving Loan Fund (Dwsrf) Assistance Recipients to Use Iron, Steel, Manufactured Products, and Construction Materials That Are Produced in the United States for Projects for the Construction, Alteration, Maintenance, or Repair of a Public Water System or Treatment Works. Time of Completion The Time of Completion for This Contract Shall Be 180 Consecutive Calendar Days Beginning With the Award of Contract and Written Notice to Proceed. Liquidated Damages for This Project Shall Be Assessed at $500.00 Per Day. Instructions to Bidders. For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. The Huttonsville Psd Reserves the Right to Reject All Bids.

Bid Results

Water / Sewer

$1,429,787.00

Public - City

Site Work

11

13

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
337
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

April 5, 2024

img_map_placeholder

9884 Seneca Trail, Mill Creek, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.