Published March 11, 2024 at 8:00 PM

Updated March 12, 2024

Site work and paving for a mixed-use development in West Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project involves removing and reconstructing Vine Street from 14th Street to 16th Street, and 28th Street from Meadow Lane to Giles Street. The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced, sanitary sewer manholes will be replaced, and sanitary sewer piping will be replaced. Sanitary Sewer services along 28th Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, specified sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. The project also includes surface restoration, traffic control and other related work. All bids shall be made on the form furnished by the City through wdm.ionwave.net and shall be filed on or before the time specified above. Each proposal shall be electronically accompanied by a scanned copy of the bid bond, or a scanned copy of a cashier's or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted, it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk's Office by the apparent low bidder within 48 hours of the bid deadline. Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by September 30, 2024. Liquidated damages in the amount of five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period. All work on Vine Street shall be complete by August 16, 2024. Liquidated damages in the amount of five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after that date. If any bidder needs assistance in registering within wdm.ionwave.net or anything associated with the submittal of an electronic bid, please contact the City Clerk's Office at 515-222-3600 or Ryan.Jacobson@wdm.iowa.gov. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.

Award

Roads / Highways

$988,991.00

Public - City

Paving, Site Work

90

8

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
95
Bidding Soon
1,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

April 22, 2024

Project location map

Multiple Locations, West Des Moines, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.