Demolition, site work, renovation and addition to a mixed-use development in Pullman, Washington. Working plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

As of March 19, 2024, bids received were rejected. Project will rebid but no definite date yet. Project Scope: Expand existing indoor golf practice facility with a 375 sq ft addition to face of building. Addition to include storage area - vestibule - and restroom. Refer to the project drawings and specifications for complete scope of work. Bid Estimate: $320 - 000-$340 - 000 Owner reserves the right to reject any and all bids and to waive any informalities or irregularities in the bids received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The responsibility of bidder and its subcontractors will be considered in making the award. Owner reserves the right to reject any or all bids and to waive informalities advantageous to Owner and/or the protection of the public interest Expand existing indoor golf practice facility with a 375 sq ft addition to face of building. Addition to include storage area, vestibule, and restroom. Refer to the attached project drawings and specifications. Contract Time shall be 180 days from Notice to Proceed. Proposals MUST BE based on this contract time. Bid Alternates, Allowances, and Unit Prices adjust the Project scope by adding, deleting, or modifying specific parts of the Work as stated hereinafter Allowances may be included in the Contract Sum due to uncertainty in scope, price and/or quantity at the time this Agreement is executed. Whenever actual costs are more or less than an allowance, the Contract Sum will be appropriately adjusted. Contractor must provide Owner with written notice of its intent to expend an allowance amount (providing Owner with the opportunity to approve or reject the cost) before expending an allowance amount.

Final Planning

Clubhouse / Community Centers

$482,090.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

21

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
127
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

September 19, 2024

img_map_placeholder

1100 NE North Fairway Rd, Pullman, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.