BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Lawler, Iowa. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Work in general consists of removal of existing culverts and small bridge and installation of concrete box culverts at Benz Street, Depot Street, Owl Street, Diagonal Street, and Grove Street within the City of Lawler. Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the Jurisdiction, for the faithful performance of the contract, in anamount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount of 5% of the total bid amount including all add alternates and shall be the Jurisdiction's bidder's bond with corporate surety satisfactory to the Jurisdiction. No other type of bid security will be accepted. The bidder's bond shall contain no condition except as provided in the specifications. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and the maintenance of said improvements in good repair from the time of acceptance of the improvements by the City for not less than two (2) years. Est. Value: $ 966,746.25 Est. Value Notes: Base Bid - $966,746.25; Alternate 1 - $237,666.75 Contractor shall fully complete the Base Bid in 110 Working Days, with a late start date of May 6, 2024. If Add-Alternate is awarded, the Contractor shall fully complete the Add-Alternate in 55 Working Days, with a late start date of June 10, 2024. Liquidated Damages in the amount of $1,000.00 per Working Day will be assessed for each Working Day that any work shall remain uncompleted beyond the Base Bid 110 Working Days and the Add-Alternate 55 Working Days allowed. The City of Lawler reserves the right to reject any and all bids.

Award

Bridges / Tunnels

$815,666.00

Public - City

Paving, Site Work

52

6

4

9

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
23
Bidding Soon
346
All Active Projects
140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Lawler, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.