BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2024 at 7:00 PM

Updated February 10, 2024

Site work and paving for a road / highway in Centennial, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000342031 Delivery Point: Centennial, Colorado Question Acceptance Deadline 02/19/2024 05:00 PM MT Questions are submitted online Yes The City of Centennial is seeking a consultant to complete the design for modifying the existing intersection configuration at the Havana and Easter intersection to improve the Dry Creek Road/Havana Street/Easter Street throughput of vehicle traffic through this area. The Arapahoe Road corridor between I-25 and Parker Road (SH 83) is the primary east-west corridor through the City of Centennial. As traffic volumes on Arapahoe Road continue to climb and new development continues at a steady pace south of the corridor, the City has identified the Dry Creek Road/Havana Street/Easter Avenue/Broncos Parkway street system as an important corridor both for east-west mobility and as a reliever for the Arapahoe Road corridor. The City reserves the right to reject any and all proposals received as a result of this RFP.

Conceptual

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
70
Bidding Soon
1,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

Project location map

E Easter Ave & S Havana St, Centennial, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.