BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work and paving for a mixed-use development in Westmont, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed reconstruction of the alley bounded on the north by West Quincy Street, on the South by 55th Street, on the East by South Adams Street and on the West by South Washington St. Reconstruction of Alley 5S with hot-mix asphalt alleys, flush PCC edge restraints, proposed storm sewer and drainage structures. PCC Alley entrances and driveways, restoration and other associated improvements. All Bids must be accompanied by a Bidder's bond, certified check, bank cashier's check or bank draft payable to the Village of Westmont for ten percent (10%) of the total amount of the Bid as provided in the Bidder Instructions. Not less than the prevailing rate of wages as determined by the Department of Labor or determined by the court on review shall be paid to all laborers, workmen and mechanics performing work under this contract. b. The Village of Westmont is exempt from the Illinois State, municipal or county Retailers Occupation Tax, Service Occupation Tax, Use Tax, and Service Use Tax as described in Illinois Compiled Statute Chapter 35. Bid prices shall not include the cost of such taxes. There is no scheduled Pre-Bid Meeting.

Award

Water / Sewer

$1,300,000.00

Public - City

Paving, Site Work

127

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
228
Bidding Soon
3,234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

May 6, 2024

Project location map

Multiple Locations, Westmont, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.