BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Louis, Missouri. Conceptual plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of August 28, 2024, per owner, this project is still in the design phase. A design team has not yet been identified. They do not have any information on when the construction phase will begin. Project No. CMAQ-9901(699) The proposed improvements are primarily intended to improve traffic flow, and therefore reduce travel time, fuel consumption, and vehicular emission output, along Dr. Martin Luther King Jr. Drive. Proposed improvements will include signal upgrades and/or enhancements, fiber optic interconnect, traffic monitoring cameras, signal timing and optimization, system integration with the Citys Real-Time Transportation Intelligence Center (TIC), and sidewalk improvements as needed for ADA compliance. The City will require professional engineering services for both preliminary engineering and construction engineering; including, but not limited to, surveying and data collection; the preparation of right-of-way plans, the preparation of construction documents (plans, technical specifications, and construction cost estimates); attendance at various meetings and presentations, assist and provide supporting documentation for the Citys coordination with affected utilities; shop drawing review; consultant services for construction engineering (if needed); and post construction traffic reporting. The Board of Public Service reserves the right to accept or reject any or all responses, or to cancel this request in part or in its entirety. All submittals become and remain the property of the City. All questions shall be directed to Helen Bryant, Contract Supervisor Board of Public Service, by e-mail at bryanth@stlouis-mo.gov (please reference project name in Subject Line if sending an e-mail), who shall be the Point of Contact for this engagement as referenced in the Policies Document MODOT - RFQ Engineering - Traffic Management Enhancements, Phase 6

Conceptual

Roads / Highways

$2,984,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
37
Bidding Soon
808
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

img_map_placeholder

Doctor M.L.K. Dr, Saint Louis, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.