BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2024 at 7:00 PM

Updated February 29, 2024

Site work for a water / sewer project in Attalla, Alabama. Completed plans call for site work for a water / sewer project.

Water Meter Project- Installation. The Work of Providing Water Meter Project- Installation Will Be Let Under One Contract. The Principal Items of Work Are Detailed Herein Below. Principal Work. 1. 2,370 Water Meters With Appurtenances No Refunds Will Be Made Except to Prime Contractor Bidders, Which Shall Be Refunded for One Bid Set. The Contractor is Hereby Advised That Time is of the Essence on This Project and That the Contract Time of 200 Consecutive Calendar Days Total and Noted Restrictions Shall Be Strictly Ob-served. Liquidated Damages Will Be Assessed if Contract Time is Exceeded. Final completion- 230 days The Con-tractor May Apply for an Extension of Time in Accordance With the Provisions of the Contract; However, Such an Extension Must Be Approved Prior to the Contract Completion Date to Avoid the Imposition of Liquidated Damages. Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3% A. Contract work provides for the Supplier to furnish the following: 1. 2,370 3/4" Water Meters 2. 6 1" Water Meters 3. 17 2" Water Meters 4. Complete Meter Washers for correct installation furnished with meters B. Meter manufacturer to furnish all meter washers required for their meter to be installed. C. All meters shall have meter number engraved on lid cover of meter and meter. If meter is not engraved, product will be rejected. D. The Contractor shall pay all fees required by RVS to complete this Project. E. Project to be awarded on Base Bid. Question Deadline 02/16/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered.

Post-Bid

Water / Sewer

$300,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
75
Bidding Soon
1,003
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 28, 2024

Project location map

To Be Determined, Attalla, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.