BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Michael, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Work Includes the Construction of Approximately: Base Bid: Line Item Item Description Unit Quantity 1 Mobilization Ls 1 2 Clearing & Grubbing Ac 0.2 3 Remove Bituminous Pavement Sy 316 4 Aggregate Surfacing Class 5 (Cv) Cy 66 5 Aggregate Base Class 5 (Cv) Cy 75 6 Temporary Gravel Access Road Ls 1 7 Driveway Restoration Ea 4 8 Type Sp9.5 Wearing Course Mixture (2,c) Ton 40 9 Type Sp12.5 Non-wearing Course Mixture (2,c) Ton 55 10 Connect to Exist. Water Main Ea 2 11 12" Gate Valve and Box Ea 1 12 16" Butterfly Valve and Box Ea 1 13 16" Alpha Coupling Ea 1 14 18" Butterfly Valve and Box Ea 1 15 20" Butterfly Valve and Box Ea 1 16 Fire Hydrant and Gate Valve Assembly Ea 2 17 20" Ductile Iron Watermain Lf 55 18 12" Pvc Watermain (Open Cut) Lf 108 19 12" Ductile Iron Watermain (Open Cut) Lf 10 20 16" Ductile Iron Watermain (Open Cut) Lf 36 21 18" Pvc Watermain (Open Cut) Lf 25 22 Traffic Control Ls 1 23 Permanent Pavement Markings Ls 1 Bid Alternate No. 1: Line Item Item Description Unit Quantity 1.1 Watermain - Ductile Iron Fittings Lb 6,902 1.2 20" Butterfly Valve and Box Ea 2 1.3 20" Hdpe Watermain Lf 3,472 1.4 Temporary Erosion and Sediment Control Ls 1 1.5 Turf Establishment (Seed, Fertilizer, Bonded Fiber Matrix) Sy 3,330 1.6 Topsoil Borrow Cy 150 Bid Alternate No. 2: Line Item Item Description Unit Quantity 2.1 Watermain - Ductile Iron Fittings Lb 6,147 2.2 18" Butterfly Valve and Box Ea 2 2.3 18" Fusible Pvc Watermain Lf 3,472 2.4 Temporary Erosion and Sediment Control Ls 1 2.5 Turf Establishment (Seed, Fertilizer, Bonded Fiber Matrix) Sy 6,660 2.6 Topsoil Borrow Cy 300 Once the Contractor has mobilized equipment to the Site, all Work under the contract shall be substantially completed within the succeeding eight (8) weeks and no later than September 15, 2024. Final completion shall be achieved no more than 30 calendar days after substantial completion. Proposal bond in the amount of not less than 5 percent of the total amount bid, drawn in favor of Joint Powers Water Board shall accompany each bid. The Owner reserves the right to reject any or all bids and to waive any irregularities and informalities therein and to award the Contract to other than the lowest bidder if, in their discretion, the interest of the Owner would be best served thereby.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Paving, Site Work

26

14

5

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
761
All Active Projects
343
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 4, 2024

img_map_placeholder

15th St NE, Saint Michael, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.