Site work and paving for a mixed-use development in Nampa, Idaho. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of August 20, 2024, this bond has been rejected. *The closed solicitation has been included below for reference: If approved, the bond would allocate $15 million to build a four-lane crossover between Twelfth and Eleventh avenues. Once built, the connection would provide a more direct route to and from Interstate 84, allowing drivers to smoothly transition between streets without requiring additional turns at intersections. When combined with other bond intersection improvements, the crossover would help reduce downtown congestion by 75%, redirect most heavy truck traffic out of the downtown area and improve safety for pedestrians, bicyclists and motorists. Construction would start between 2026 and 2027. The city would use $9 million to design access roads between Nampa and the upcoming State Highway 16/I-84 Interchange. The Idaho Transportation Department (ITD) is currently building the SH-16 extension. The city would design the Nampa connection on the south side of the interstate, alongside a separate east-west connection extending additional nearby roads. The funds would allow the city to finish the design portion of the $80 million project. Once completed, the connection would reduce congestion by up to 10%. The city expects more than 20,000 vehicles would use the connection by 2050. Design would begin in 2027. The bond would provide $5 million to improve Library Square, which would connect with the Twelfth and Eleventh avenues crossover project to reduce congestion. The project would increase Eleventh Avenue to six lanes, allow two-way traffic on Eleventh Avenue and determine if two-way traffic is needed on Twelfth Avenue. If completed, the project would reduce congestion by 20%, reduce motorist delays and improve safety. Construction would begin in 2025. The city would spread an additional $5 million across six Safe Routes to School sidewalk improvement projects. Bond approval would allow the city to build and repair sidewalks near elementary, middle and high schools, increasing student safety and mobility. Construction for all six projects would begin between 2025 and 2026. *The contact(s) will not accept phone call inquiries at this time.

Project Abandoned

Roads / Highways

$38,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
5
Bidding Soon
173
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

img_map_placeholder

Multiple Locations, Nampa, ID


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.