BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Platteville, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Disclaimer: In order to bid on this project, you must purchase a bid set from Delta 3 Engineering Camp Street Water and Sewer. Sewer and Water Construction, Water Utilities, Sanitary Sewer (Gravity), Traffic Control, Water Main (Repair/Replace) Rehabilitation, Sidewalks/Curbs/Gutters, Televising Sewers, Traffic Control/Flagging, Paving (Highway, Road or Street) Est. Completion Date: Aug. 23, 2024 Replacement of water main and sanitary sewer on Camp Street from Lancaster Street to Elm Street including HMA pavement patching, concrete sidewalk patching, and curb patching. Question Deadline 03/04/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Written inquiries shall be mailed, or hand delivered to Daniel J. Dreessens, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. B. Electronic inquiries shall be emailed to the following email address: dreessensd@delta3eng.biz with the subject line as the project's name.

Award

Roads / Highways

$499,216.00

Public - City

Paving, Site Work

12

11

4

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
37
Bidding Soon
562
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 20, 2024

img_map_placeholder

Camp St, Platteville, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.