BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 31, 2026

Site work for a water / sewer project in Hallandale Beach, Florida. Completed plans call for site work for a water / sewer project.

Update:https://tinyurl.com/nkcpux2h The intent of the project is to convert the City's existing Lift Station #13 from a 'Can Style' lift station to a submersible lift station in the current location. Lift Station #13 is located adjacent to the Gulfstream Academy of Hallandale Beach on SW 8th Street. The Lift Station #13 replacement project scope is based on the City's Wastewater Master Plan dated March 2018.This project is needed to accommodate new development in the area. Project is included City of Hallandale Beach Fiscal Year 2025-2029 Page No 100 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The intent of the project is to convert the City's existing Lift Station #13 from a 'Can Style' lift station to a submersible lift station in the current location. Lift Station #13 is located adjacent to the Gulfstream Academy of Hallandale Beach on SW 8th Street. The Lift Station #13 replacement project scope is based on the City's Wastewater Master Plan dated March 2018.This project is needed to accommodate new development in the area. The project is include in the city's 2024-2028 Capital Improvement Program (CIP) WORK COVERED BY THESE CONTRACT DOCUMENTS A. The Lift Station #13 Rehabilitation project is located just west of SW 9th Avenue on SW 8th Street in the City of Hallandale Beach, Florida. B. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Question Deadline 11/17/2025 5 pm .Question sent by email kvohwinkel@cohb.org

Award

Water / Sewer

$3,387,900.00

Public - City

Site Work

37

20

6

8

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
0
Bidding Soon
985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2025

February 13, 2026

Project location map

SW 9th Ave & SW 8th St, Hallandale Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.