BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Porterville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and educational facility.

The Porterville Unified School District, acting by and through its Governing Board, hereinafter referred to as the Owner, will receive informal bids for the award of contracts per CUPCCAA requirements for the construction of the Monache Ag: Gate Power and Lighting Project Classification * C-7 (Low Voltage Systems Contractor) Classification *C-10 (Electrical Contractor) Responsible Bidders Date = (Approved List of Responsible Bidders Announced) :02/26/2024 Submission Cut Off Date = (Deadline for Application submission to Quality Bidders) :02/19/2024 Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Porterville Unified School District at its offices located at 600 West Grand Avenue, Porterville, California 93257. All bidders will be deemed to have notice of all conditions and information which bidders could have obtained by attending the pre-bid conference, including but not limited to any conditions in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon. The Work includes the installation of a new 100A service panel at pre-prepped area and continuation of underground pathways from this location by means of trenching/excavating, backfill and compaction to the light pole & gate locations, provide & install Christy boxes at each light pole location, installing District supplied light poles, provide & install weather tight TCs at each light pole, install District provided switches, pull & terminate all line & low voltage systems to provide operational lighting & gate power with controls at gate. Bids shall be on a lump sum basis. Winning bidder will be notified before the end of day March 4, 2024. The Work shall be completed within 30 calendar days from the date of the Owners Notice to Proceed. EXAMINATION AND PROCUREMENT OF CONTRACT DOCUMENTS: N/A 9. SUBSTITUTIONS: N/A Submit bid security with proposal, made payable to Owner, in amount of 10% of the Bid, in the form of certified check, bid bond, cashiers check or cash. Bid security will be retained until Agreement is signed and required bonds furnished. If any bidder refuses to sign the Agreement Form within 7 days after Award, the Owner will retain his bid security as liquidated damages. To enable compliance with California Code of Civil Procedure Section 995.311, each contractor shall provide, prior to Contract Award, a print-out of information from the Department of Insurance confirming the surety is an admitted surety insurer. The Owner will not consider or accept any bids from contractors or subcontractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code of the Monache Ag: Gate Power & Lighting Project 24-019 State of California, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the Contractor shall have a C-10 and C-7 license and shall maintain that license in good standing through Project completion and all applicable warranty periods. The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. Unless otherwise required by law, no bidder may withdraw his bid for a period of 30 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 30 days to make a decision regarding the rejection of bids or the award of the Contract. The Project is a public work and under California Labor Code Section 1770 et seq., the Director of the California Department of Industrial Relations (DIR) has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the rates are on file at the Owners principal office. It shall be mandatory upon the Contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this Agreement. The Owner will not accept any bid or enter into any contract without proof of the bidders current registration to perform public work under Labor Code Section 1725.5. Bidders shall not accept any sub-bid or enter into any subcontract without proof of the subcontractors current registration to perform public work under Labor Code Section 1725.5. LABOR COMPLIANCE: Contractor and all subcontractors shall comply with Labor Code Section 1776. In accordance with Labor Code section 1771.4(a)(1), the Project is subject to compliance monitoring and enforcement by the DIR. The Contractor and each subcontractor shall furnish a certified copy of all payroll records directly to the Labor Commissioner on a monthly basis, unless directed by the Owner to furnish such records more often, and in the format prescribed by the Labor Commissioner. RETENTION FUND: The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. REQUIRED CERTIFICATIONS: Bids must be accompanied by the following forms, fully executed by each Bidder: .1 Sub-Contractor List .2 Non-Collusion Affidavit .3 Contractors Certificate Regarding Workers Compensation .4 Fingerprinting Notice and Acknowledgment .5 Acknowledgment regarding Drug Free Workplace .6 DVBE Certification .7 DIR Listing .8 Bid Bond .9 Performance Bond 10. Payment Bond Thsi project has an estimated value range of $60K to $90K.

Post-Bid

Educational

$90,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
43
Bidding Soon
643
All Active Projects
314
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 4, 2024

April 3, 2024

May 3, 2024

img_map_placeholder

960 N Newcomb St, Porterville, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.