Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 9, 2024 at 7:00 PM
Updated March 10, 2024
Site work and paving for a mixed-use development in Muskego, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This project, officially known as Tess Corners Drive Bridge Replacement, involves removing four pipe arch culverts, constructing a temporary diversion channel, stream restoration, constructing a two cell box culvert, concrete curb and gutter, base aggregate, guardrail, asphalt pavement, landscaping restoration, traffic control, and erosion control. All work is included in a single prime contract. Project Description Construct a dual cell 12x5 box culvert along Tess Corners Creek as well as a temporary diversion channel. Reconstruct approximately 80 feet of roadway on Tess Corners Drive, which includes concrete curb and gutter, base aggregate, guard rail, asphalt pavement binder and surface course, rough and fine grading of the proposed BMP, traffic control, landscape restoration, and erosion control.
Bid Results
Bridges / Tunnels
$445,021.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2024
June 15, 2024
Tess Corners Dr, Muskego, WI
Related To This Project
Muskego, WI
Bid Date: Apr 16 2024
Muskego, WI
--
Muskego, WI
--
Muskego, WI
Bid Date: Feb 28 2025
Muskego, WI
--
Muskego, WI
--
Muskego, WI
--
Muskego, WI
--
Muskego, WI
Bid Date: Feb 29 2024
Muskego, WI
Bid Date: Feb 22 2024
Muskego, WI
--
Muskego, WI
Bid Date: Mar 11 2022
Muskego, WI
Bid Date: Feb 17 2022
Muskego, WI
Bid Date: Jul 17 2023
Muskego, WI
Bid Date: Jun 09 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
