BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a road / highway in Hemet, California. Completed plans call for the renovation of a road / highway; and for site work for a road / highway.

The scope of work generally consists of but is not limited to cold milling of existing asphalt to base material, reconditioning of exposed base material, pulverize existing asphalt and blending into underlaying material, grading and compaction of reclaimed material, dispose of excess material, construction of new asphalt overlays, traffic loops replacement, adjust valve caps & manhole rims to finished surface, remove & replace pcc gutters, replace striping and markings, remove existing and construct ADA ramps, all as shown on the attached approved plans and specifications. LOCATION OF WORK The work to be constructed is located on the following streets and limits: Portion of Acacia Avenue from Harvard Street to City Limits (+- 4,092 L.F.) Portion of Banbury Drive from 1013 Banbury Drive to Karee Drive (+- 260 L.F.) Portion of Bariloche Lane from Hemet Street to Mosport Street (+- 500 L.F.) Portion of Corwin Place from 1015 Corwin Place to Washington Avenue (+- 527 L.F.) Portion of Karee Drive from/ Corwin Place to Banbury Drive (+- 264 L.F.) Portion of Emerald Street from Jade Drive to Opal Avenue (+- 751 L.F.) Portion of Jade Drive from Gilbert Street to Emerald Street (+- 552 L.F.) Portion of Onyx Avenue from Gilbert Street to Emerald Street (+- 553 L.F.) Portion of Opal Avenue from Gilbert Street to Emerald Street (+- 553 L.F.) Portion of Ruby Avenue from Gilbert Street to Emerald Street (+- 553 L.F.) Portion of Gainesville Avenue from Mosport Street to Zolder Street (+- 332 L.F.) Portion of Limerock Avenue from Mosport Street to Zolder Street (+- 326 L.F.) Portion of Mosport Street from Gainesville Avenue to Limerock Avenue (+- 741 L.F.) Portion of Zolder Street from Gainesville Avenue to Lincoln Avenue (+- 1,105 L.F.) Portion of Girard Street from El Nita Lane to Florida Ave. (+- 661 L.F.) Pre-Bid Meeting: No Online Q&A: Yes Q&A Deadline: 03/05/2024 3:00 PM (PST)

Award

Roads / Highways

$1,869,564.00

Public - City

Renovation, Site Work

11

7

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
87
Bidding Soon
1,781
All Active Projects
826
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.