BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Salt Lake City, Utah. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The engineer's estimate for this project has a range from $700,000 to $850,000. Skywest Hangar Taxilane Reconstruction Background Issuing Procurement Unit, Conducting Procurement Unit, and Solicitation Number The State of Utah Division of Purchasing is the issuing procurement unit and The Department of Workforce Services is the conducting procurement unit for this IFB (referred to as "the State"). The reference number for this IFB is Solicitation #BH24-54. This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this IFB. Additional Information Bidders are prohibited from communications regarding this IFB with the conducting procurement unit staff, evaluation committee members, or other associated individuals EXCEPT the State of Utah Division of Purchasing procurement officer overseeing this IFB. Wherever in this IFB an item is defined by using a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, "or equivalent" apply; and invites the submission of equivalent products by the Bidders. Bidders may be required to submit product samples to assist the chief procurement officer or head of a procurement unit with independent procurement authority in evaluating whether a procurement item meets the specifications and other requirements set forth in the invitation to bid. Product samples must be furnished free of charge unless otherwise stated in the invitation for bids, and if not destroyed by testing, will upon written request within any deadline stated in the invitation for bids, be returned at the bidder's expense. Samples must be labeled or otherwise identified as specified in the invitation for bids by the procurement unit. Project Description: This project is a continuing phase to maintain an airports infrastructure, The existing taxilane is failing and continuous spalling is creating a FOD hazard for all aircraft in the area. The extent of the damage is to the point where repairs by Airport Maintenance are not lasting because of the pavement condition. Reconstructing this taxilane will provide a new safe entrance for aircraft using the SkyWest maintenance facility and reduce FOD potential for aircraft on Taxiway F in the vicinity of the taxilane. The project will consist of a 5" mill of the existing taxilane and an asphalt pavement overlay. Temporary and permanent drainage improvements will be designed for the project site. Also included in the project will be the installation and relocation of the existing sign and replace the existing lights with LED fixtures and new cable. Project Address: Salt Lake City International Airport Anticipated Construction Notice to Proceed: April 22, 2024 1. Substantial Completion: 39 calendar days from the date of April 22, 2024, Construction Notice to Proceed. 2. Final Acceptance: 15 calendar days following completion of Owner submitted punch list items Question Deadline 02/29/2024 at 5:00 PM MT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Transportation Terminals

$850,000.00

Public - State/Provincial

Paving, Site Work

36

19

5

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
26
Bidding Soon
537
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 22, 2024

img_map_placeholder

W Terminal Dr, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.