Renovation of an educational facility in Madison, Connecticut. Completed plans call for the renovation of a 150,000-square-foot educational facility.
Polson Middle School HVAC Modernization, Electrical Power and Distribution Upgrade, Auditorium Modernization The Work includes renovation of the Auditorium and Gymnasium, power upgrades to the existing electrical service along with installation of a new generator, and HVAC upgrades. Question Deadline 09/02/2025 at 5:00 PM ET Each Bid shall be accompanied by a bid security in the form of a Bid Bond in an amount not less than Ten Percent (10%) of the total amount of the base bid. Said Bid Bond shall be issued by a surety that is licensed to do business in the State of Connecticut and is rated A-(VII) or better by A.M. Best. The bid security shall be drawn in favor of Gilbane Building Company. Bids received without such bid bond will be considered non-responsive and therefore rejected, no exceptions. In the event of a re-bid, each bid must be accompanied by a new Bid Bond. Bid Bonds submitted for previous bids are not valid and will not be accepted. Bids received for re-bids without such bid bond will be considered non-responsive and therefore rejected, no exceptions. Reference Section 1iv Trade Contract Bid Bond Form in the Gilbane Project Manual. The Work includes renovation of the Auditorium and Gymnasium, power upgrades to the existing electrical service along with installation of a new generator, and HVAC upgrades. The Auditorium scope includes abatement of ACM flooring and gypsum ceilings followed by a new RTU (replacement), lighting, ceilings, flooring, seating, theatrical A/V and lighting, theatrical rigging, and finish improvements to the stage surround. The Gymnasium scope includes two new replacement AHUs and ductwork, painting of walls and exposed roof decking and joists, refinishing of the wood floor, and new motorized bleachers. The power upgrades scope of work includes a new 1500KW generator, new 4000A service and switchgear (in a new location separate from the existing main electrical room), new electrical panels and feeders for the new HVAC equipment, and new lighting in approximately half of the corridors. The HVAC scope includes six new RTUs (two of which are replacements) serving the gym, auditorium, and other spaces. The scope also includes replacement furnaces and dampers in nine existing-to-remain penthouses along with new condensers adjacent to the penthouses. New VRF cassette systems will be provided in three classroom wings serving approximately twenty-five classrooms. New RTU and condenser support steel will be provided at approximately eleven locations. The following work will occur in late winter/ early spring of 2026: VRF rough-in (second shift), some of the steel work to support RTUs and condensers (off-hours), power rough-in (RGS raceways) on the roof for the HVAC equipment and several new panels (normal working hours), and fitout of the new main electrical room (normal working hours) which includes slab-on-grade demolition and setting of switchgear and electrical rough-in.
Bid Results
Educational
$14,800,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
October 8, 2025
302 Green Hill Rd, Madison, CT
Related To This Project
Madison, CT
Bid Date: Mar 12 2024
Madison, CT
Bid Date: Apr 05 2024
Madison, CT
Bid Date: Apr 01 2024
Madison, CT
Bid Date: Apr 11 2024
Madison, CT
Bid Date: May 14 2024
Madison, CT
--
Madison, CT
Bid Date: May 15 2024
Madison, CT
--
Madison, CT
Bid Date: Mar 04 2024
Madison, CT
--
Madison, CT
Bid Date: Feb 07 2024
Madison, CT
Bid Date: Jan 04 2024
Madison, CT
--
Madison, CT
--
Madison, CT
Bid Date: Dec 22 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.