Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Crestview, Florida. Working plans call for site work for a water / sewer project.
As of August 20, 2024, an engineer has been selected and this project is in the final planning status and pending permits. It is anticipated bidding will commence in 2-3 month. A firm timeline for construction has not been determined. This project is included in the City of Crestview's FY 2024-2029 CIP. *The closed solicitation has been included below for reference: The City of Crestview has seen significant growth in recent years and that growth has created the need to expand and build new residential communities. This growth has led to an increase in influent flow at the Crestview Wastewater Treatment Plant (WWTP). In addition, construction of the SR 85 bypass road and East-West corridor has begun and these roadways are being constructed on the existing effluent spray field area, thus reducing overall effluent disposal capacity at the WWTP. As part of the Phase IV WWTP Expansion and Rapid-Rate Infiltration Basins (RIBs) project, Jacobs designed the current RIBs site (5 RIBs with 0.63 million gallons per day (mgd) permitted to capacity) to be expanded by the construction of RIB No. 6 as required by area growth, influent flows and property acquisition. The existing RIB system was put into service in July 2014. The City purchased an approximately 49-acre parcel to the Northeast of the WWTP to construct additional RIBs and help satisfy the need for additional effluent disposal capacity. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Water / Sewer
$3,860,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2024
To Be Determined, Crestview, FL
Related To This Project
Crestview, FL
--
Crestview, FL
Bid Date: Apr 03 2024
Crestview, FL
Bid Date: Apr 16 2024
Crestview, FL
Bid Date: Apr 03 2024
Crestview, FL
Bid Date: Apr 03 2024
Crestview, FL
Bid Date: Apr 10 2024
Crestview, FL
Bid Date: May 22 2024
Crestview, FL
Bid Date: Apr 01 2024
Crestview, FL
--
Crestview, FL
Bid Date: Mar 14 2024
Crestview, FL
Bid Date: May 15 2024
Crestview, FL
--
Crestview, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.