EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2024 at 8:00 PM

Updated March 22, 2024

Renovation of a municipal facility in Wellesley Hills, Massachusetts. Completed plans call for the renovation of a municipal facility.

The project consists of removing existing fluorescent fixtures and replacing with new LED fixtures, including demolition and disposal of fixtures, installing and reconnecting new fixtures, and new dimming controls in selected areas. The general intent is for one-for-one fixture replacements in same location. All bidding Requests for Information (RFIs) shall be submitted online by 03/08/2024 at 4:00PM EST for general bids. The work is estimated to cost $950,000.00. The project work consists of removing existing fluorescent and HID lighting fixture and replacing with new LED fixtures including demolition and disposal of fixtures, installing and reconnecting new fixtures, new dimming controls in selected areas, extension and reworking as necessary. The general intent is for one-for-one fixture replacements in same location. The existing lighting fluorescent and HID lighting fixtures are mercury containing and must be legally disposed of according the State of Massachusetts and the Universal Waste laws. Existing fixtures were installed in 2010 and ballasts do not contain PCB. B. The work will include all operations necessary to deliver the building in a fully installed and operable condition including obtaining all necessary licenses, permits, and certificates. C. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Removal and disposal of existing fluorescent and HID lighting fixtures. 2. New LED lighting fixtures 3. New dimming controls and sensors 4. Extension of conduit & wiring and reworking existing circuiting. D. Reference To Drawings: The work to be done under this Contract is shown on the Drawings listed at the end of this Section. E. The Contractor shall provide a schedule for completion of the project to TOWN OF WELLESLEY within the construction period set forth in the Contract. F. The Massachusetts Standard Prevailing Labor Wage rates contained in the Contract Documents, as updated on an annual basis, will be used throughout the construction of this project.

Post-Bid

Municipal

$950,000.00

Public - City

Renovation

17

10

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Haul Routes, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Joists
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
170
Bidding Soon
3,103
All Active Projects
1,246
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 12, 2024

img_map_placeholder

50 Rice St, Wellesley Hills, MA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Removing Existing Fluorescent Fixtures and Replacing With New LED Fixtures

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.