BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2024 at 8:00 PM

Updated October 4, 2024

Renovation of a fitness / recreation center in Wellesley Hills, Massachusetts. Completed plans call for the renovation of a fitness / recreation center.

Warren Building, 90 Washington St. Wellesley, MA. Project scope includes: HVAC and fire alarm replacement, flat roof replacement, spatial reconfiguration in the BOH Suite, lighting replacement and associated plumbing, electrical, and finishes. Filed Sub Trades are: Roofing and Flashing, Acoustical Tile Ceilings, Painting, Fire Suppression, Plumbing, HVAC, and Electrical. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Bidders will be required to hold bids to 11/30/24 pending STM funding approval. Question Deadline 09/26/2024 at 11:00 AM ET All bidding Requests for Information (RFIs) shall be submitted online The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. Replacement of the existing membrane roofing system. 2. New structural steel. 3. Interior painting 4. Framing, gypsum board, doors, window film, painting. 5. Carpet and flooring. 6. ACT ceilings 7. Attic blown-in insulation. 8. Replacement of dry sprinkler system and demolition of the existing system components. 9. Rework of existing wet sprinkler system 10. Replacement of hot water heater and demolition of gas-fired systems 11. Replacement of gas-fired kitchen ranges with induction units. 12. Replacement of existing HVAC system and demolition of gas fired systems. Ductwork cleaning. Installation of new air handling units, ductwork, piping, VRF system, automatic temperature controls, makeup air unit, exhaust fans, etc. 13. Removal and disposal of existing fluorescent lighting fixtures. 14. New LED lighting fixtures 15. Extension of conduit & wiring and reworking existing circuiting. 16. Complete fire alarm system replacement and demolition of existing fire alarm system components. 17. Site work for modifications to building entrances. 18. Targeted work in the bathrooms for MAAB adjustments. 19. Minor site work for MAAB adjustments.

Post-Bid

Fitness / Rec Centers

$4,567,380.00

Public - City

Renovation

86

23

52

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
625
Active Projects
327
Bidding Soon
4,520
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

June 1, 2025

Project location map

90 Washington St, Wellesley Hills, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.