BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2024 at 8:00 PM

Updated March 24, 2024

Site work, paving and outdoor lighting for a mixed-use development in Wellesley Hills, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Washington Street Sidewalk Extension. Sidewalk extension on Washington St from 849 Washington St to the Natick Town line (2,908 feet). Sidewalks, wheelchair ramps, curbing, bio swale drainage, pedestrian lights, signage and pavement markings. Prequalification by Online for "Highway Construction" required.

Bid Results

Sidewalks / Parking Lot

$445,545.00

Public - City

Outdoor Lighting, Paving, Site Work

21

8

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
276
Bidding Soon
4,073
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

June 14, 2024

Project location map

Washington St, Wellesley Hills, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.