BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Liberty, Missouri. Completed plans call for the renovation of a educational facility.

PURPOSE The purpose of this ITB is to establish an agreement for the removal and replacement of specified exterior doors at Liberty High School, Heritage Middle School and Ridgeview Elementary. The School District reserves the right to terminate the agreement at will. Any price adjustments must be justified and submitted in writing with supporting documentation for approval by the Facilities and Grounds Department. Price increases over the term of the contract will subject the agreement for review for possible termination, rebidding, and/or renegotiation. Thursday, March 7, 2024 Question Deadline - 3:00 PM CST All questions, requests for information or clarification pertaining to this bid must be submitted in writing to Jason Breit at jason.breit@lps53.org. The District reserves the right to accept or reject all or any part of any quote/proposal/bid, to waive technicalities, and to accept the offer that the District considers to be the most advantageous. A. Removal and disposal of all old existing doors, frames, glass and associated materials will be the responsibility of the contractor. All wiring to be salvaged and pulled back out and away from frames to be reused. B. Ordering, delivery and installation of new doors, frames and associated hardware/materials for this scope of work will be the responsibility of the contractor. C. Before ordering, shop drawings with clear detail of all associated materials shall be provided to Liberty Public Schools for approval prior to placing order. D. Demo and installation of new doors and systems will be coordinated with Justin Presson, our Project Manager. E. Please provide lead times at time of submitting a quote. F. The integration of the burglar and door control system will be by others, a pathway with pull string will be the responsibility of the contractor installing doors and frames. Coordinate location of these items with the Owner. G. All wiring is to be concealed inside the frames, no surface mount unless approved by the District prior to installation. H. It is the responsibility of the contractor to secure the site each night before leaving, if doors are not able to be locked or glass is not installed temporary means to secure the property will be the responsibility of the contractor. I. Any electrical associated with installation is the responsibility of the contractor, this included if ADA operators are present. If ADA operators are present, the contractor is to make sure buttons are installed and functioning properly which would include all associated wiring. TIME OF COMPLETION Work is to begin June 1, 2024 and be completed by August 1, 2024. A district wide Summer School schedule will be available and shared out in the coming weeks once finalized.

Award

Educational

$141,595.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
33
Bidding Soon
739
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Liberty, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.