BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Liberty, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Seal coat application shall consist of the first coat by squeegee applicator and second coat shall be sprayed on. Seal coat shall be Mac-Problend Slurry or equivalent. Seal coats must contain a minimum of 1 1/2 percent of hot blended rubberized latex additives. Oil spots must be primed or cleaned to ensure no bleed through occurs after sealing. Hot Pour crack fill should be Crafco-Pls or equivalent (certification is required prior to start of job) All cracks prior to filling must be blown out with an air compressor to ensure it is free of debris. If the temperature falls below 380 degrees F the owner will require all pouring to cease until the temperature has risen Neatly Saw cut OR mill each patch, excavate to stated depth and haul all debris off site. Tack Coat all areas to achieve a firm bond between new and old asphalt. Install bituminous surface course asphalt to within 1 1/2 " of finish grade on areas with a depth greater than 2" and compact thoroughly with roller A Payment Bond will be required from any vendor that submits a total bid proposal in excess of $50,000. The undersigned Bidder agrees to furnish a Payment Bond in the amount of 100% of the total contract value prior to execution of the formal service contract, agreement or issuance of an official district purchase order. Question Deadline 03/04/2024 at 3:00 PM CT All questions, requests for information or clarification pertaining to this bid must be submitted in writing to Jason Breit at jason.breit@lps53.org Monday, March 18, 2024 BOE Recommendation for Award Tuesday, March 19, 2024 Vendor Award Notification Work is to begin June 1, 2024 and be completed by August 1, 2024. A district wide Summer School schedule will be available and shared out in the coming weeks once finalized. Some sites listed herein will need to be completed in the month of June 2024. The other sites listed herein will need to be completed in the month of July 2024, due to Summer School activities. The District reserves the right to accept or reject all or any part of any quote/proposal/bid, to waive technicalities, and to accept the offer that the District considers to be the most advantageous.

Award

Roads / Highways

$359,292.00

Public - City

Paving, Site Work

4

3

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
33
Bidding Soon
739
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Liberty, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.