Demolition, site work, paving and new construction of a bridge / tunnel in Weathersfield, Vermont. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The goal of this project is to remove the existing concrete bridge superstructure and replace it with new. The existing concrete superstructure is deteriorated, has been damaged by flooding, and can no longer safely carry current traffic loads. The existing substructure (abutments and wingwalls) will be retained and reused. The project includes related site work, excavation and paving. 2. SCOPE OF WORK 2.1 Complete the work as shown on the project plans and as included in the project specifications, bid documents and contract documents. 2.2 Remove and dispose of the existing bridge superstructure. 2.3 Preserve and reuse the existing substructure (abutments and wingwalls). 2.4 Design, Fabricate, Construct and Install a replacement bridge superstructure. 2.5 Site work, excavation, guardrail, paving, grading, erosion prevention, sediment control and traffic control. 2.6 A temporary bridge was installed on the southern downstream side of the Ascutney Basin bridge. The temporary bridge is to be removed by the Contractor and delivered to its owner (Daniels Construction, 4409 US 5 S, Ascutney, VT,05030) after completion of the new bridge superstructure project. The site of the temporary bridge is to be restored to original grade, and the soil seeded and mulched. Install and maintain erosion prevention measures until permanent vegetation is established at this adjacent site. 2.7 Provide sufficient management and technical staff to manage the project, the construction, to provide and maintain the required Contract Documents (submittals, requests for information, request for change, etc.). Question Period ends on March 18, 2024, at 10am THE TOWN RESERVES THE RIGHT To accept or reject any or all bids and to accept proposals other than the lowest price, and to amend, modify, or withdraw this Request for Bids.

Award

Bridges / Tunnels

$343,810.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
101
Bidding Soon
1,719
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

July 1, 2024

img_map_placeholder

Ascutney Basin Rd, Weathersfield, VT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.