BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a mixed-use development in Avon, South Dakota. Working plans call for the remodel of a educational facility.

*As of 03/20/2024, all bids have been rejected. A timeline for rebid has not been established yet.* The Avon School District is accepting sealed bids for its Locker Room Remodel Project. Questions about the project should be directed to Gregg Voigt, Head of Maintenance, at 605-286-3291 ext. 165. The Avon School Board reserves the right to reject any or all bids. Anticipated Award Date: March 22, 2024 The Avon School District will make full payment to the successful Bidder no later than 30 days from when the work is satisfactorily completed and accepted by the Avon School District This project is to provide the Avon School District with a complete remodel of existing locker rooms. The contractor is responsible for the following: 1. Contractor must obtain all required Permits. 2. Follow all applicable O.S.H.A. and N.I.O.S.H. standards while performing work. 3. Contractor will notify Owner prior to working on site. 4. Contractor will need to follow all the city, state, and national codes and regulations pertinent to the project. 5. Project will include several aspects including demolition, reconstruction, plumbing, electrical, and flooring as listed below: - Demolition: 1. Demolition of block walls, tiled walls, and concrete flooring for plumbing purposes. 2. Removal of aggregate materials as necessary for in floor plumbing purposes. 3. Removal of demolition material/debris. (School District will provide locations for debris, but the contractor is responsible for getting materials to designated locations) 4. Reconstruction 5. Provide and install fill aggregate materials as necessary for filling floor plumbing trenches. 6. Provide and repour concrete flooring as necessary for plumbing. 7. Provide and install new 2”x6” walls where needed. 8. Provide and install ½” MMR drywall, along with a plywood backer installed behind all drywall. 9. Provide and install ceramic tiling along walls with bathroom fixtures

Final Planning

Educational

$890,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
10
Bidding Soon
160
All Active Projects
67
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

December 1, 2024

img_map_placeholder

To Be Determined, Avon, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.