EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Macungie, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work to be performed under this Contract includes construction of a bike path including, but not limited to, the following: connection to the existing sidewalks, installation of the ADA facilities, installation of a storm sewer pipe, storm inlet, concrete flared end section, rip-rap, curb ramps, earthwork including strip topsoil, cut/fill, the export/import of excess fill, fine grading, replace topsoil and restoration. All work will occur within Lower Macungie Township property and within the Limits of Disturbance as shown on the Contract Drawings, along with provisions for all necessary erosion and sediment controls. Lower Macungie Township will receive sealed bids for its 2024 Hillside School Walking Path. The project includes the Construction of a bike path including but not limited to the following: connection to existing sidewalks installation of ADA facilities, installation of storm sewer cross pipe, associated earthwork, and restoration. All bid must be accompanied by Bid Security made payable to Lower Macungie Township, in an amount of ten percent (10%) of the Bid price in the form of a certified or bank check, or a Bid Bond issued by a surety meeting the requirements stated in the bid documents. Performance Bonds will be required from the successful bidder in the full amount of the annual contract price as started in the bid documents. Bidders must be PennDOT prequalified per PennDOT Pub. 408, Section 102. Lower Macungie Township reserves the right to waive any informality in, and/or to reject, any or all bids. Question Deadline 03/11/2024 at 4:00 PM ET Online Portal

Award

Sidewalks / Parking Lot

$137,722.00

Public - City

Paving, Site Work

12

9

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
181
Bidding Soon
2,763
All Active Projects
1,333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

April 17, 2024

img_map_placeholder

Multiple Locations, Macungie, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hillside School Trail Connection

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.