BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

As of June 26, 2024, project was awarded to SJ Hamill Construction, LLC in the amount of $19,624,664.12. The Work, located in the William E. Enston Homes green space adjacent to Huger St, will include the construction of a new stormwater pump station facility including all components related to the electrical building, wet well, valve vaults, pumps, electrical, HVAC, and other items associated with a new stormwater pump station. The Work also includes the installation/tie-in to existing stormwater drainage outfall and surface collection infrastructure, installation of Low Impact Development measures and other landscaping, minor utility work necessary to construct the project, as-built survey and record drawings, site security and traffic control, as shown in the Drawings. All project information, including any addenda, is available at this website Contractor Qualifications: The City of Charleston received Statements of Qualifications for the King Street Pump Station Project on November 8, 2023 and has pre-qualified all contractors eligible to submit a bid for this project. The Contractors selected to submit a Bid for this Project are: Crowder Construction, Don Moorhead Construction, Kiewit Infrastructure South, Ruby-Collins, SJ Hamill, and Triad Engineering & Contracting. Bids from Contractors not included on this list will not be accepted. Additionally, Charleston Water System (CWS) requires the use of a CWS qualified contractor to perform work on all CWS-owned utilities. Project Funding: This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), which is administered by the South Carolina Rural Infrastructure Authority (RIA) and funded by federal State and Local Fiscal Recovery Funds (SLFRF) through the American Rescue Plan Act (ARPA). All federal SLFRF requirements and SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations. combined 20% for minority and women-owned business enterprise participation. substantial completion within 540 consecutive calendar days and to fully complete the project within 630 consecutive calendar days thereafter. Question Deadline 04/12/2024 Every request for such interpretation should be in writing addressed to Anthony Giralo, The City of Charleston, 2 George Street, Suite 2100, Charleston, SC 29401 or by e-mail: giraloa@charleston-sc.gov. To be given consideration, such request must be received at least 10 days prior to the date fixed for the opening of Bids.

Award

Water / Sewer

$19,624,664.00

Public - City

Site Work

78

28

81

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
75
Bidding Soon
875
All Active Projects
404
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 22, 2024

August 26, 2024

January 28, 2026

img_map_placeholder

900 King St, Charleston, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.