BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kearney, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Location: I-80, Minden - Gibbon In County: Buffalo Length: 4.2 Miles Start Date: 06/24/2024 Calendar Days: 146 Price Range: $5,000,000.00 to $10,000,000.00 This project is funded under the Federal-Aid Highway Act, all appropriate Federal requirements will apply. The Department reserves the right to change these quantities without notice. The last day to submit acceptable prequalification statements for this letting is by 5:00 P.M. on Saturday March 16, 2024. If you have any questions as you are using our Website, please contact us at: Nebraska Department of Transportation Contract Lettings Section P.O. Box 94759, Lincoln, NE 68509-4759, Phone (402) 479-4525, FAX (402) 479-3803. Email: DOT.ContractLettings@nebraska.gov NE DOT - 400 - Bituminous, General (All Classes) - I-80 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Prior to the letting, any questions pertaining to the Special Provisions or the Plans for this project should be submitted to NDOT in a written format through the Bid Express (BidX) website at https://www.bidx.com/ne/lettings. Likewise, NDOT will post answers exclusively to the BidX website. All official answers will be identified as "Authorized by NDOT." Questions will not be answered verbally. The purpose of the Cold Milling Class 4 is to remove all existing asphaltic concrete down to the concrete pavement below. The milling depth shall be increased or reduced, as directed by the Engineer. Salvaged material produced on this project is the property of the State but shall be furnished for use on this project at no cost to the Contractor. Any remaining salvaged bituminous material produced from the cold milling operations not used in production of asphaltic concrete on the project shall be stockpiled at a site provided by the State. The State provided stockpile site is located at approximate Reference Post 279.92, on the North side of I-80, as directed by the Engineer.

Award

Roads / Highways

$7,780,367.00

Public - State/Provincial

Paving, Site Work

118

9

4

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
14
Bidding Soon
127
All Active Projects
58
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2024

June 24, 2024

img_map_placeholder

Interstate 80, Kearney, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.