Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 23, 2024 at 8:00 PM
Updated March 24, 2024
Site work for a civil project in Crossfield, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.
BF 81919 carries Township Road 281A over a tributary to Dogpound Creek, near Bottrel. The crossing provides the only access to local residents and livestock operations along this dead-end road. The replacement structure will be a 2.2 m CSP culvert on a similar alignment to that of the existing structure, with some alterations to the gravel road’s vertical alignment. Specifics beyond this have not been determined at this time and no drawings are available yet. The construction completion date will be October 31, 2024. BF 8668, carries TR 274 over a tributary to nose Creek near Airdrie. The crossing provides access to local residents, in addition to serving as a larger connector route between rural communities spanning from Irricana to Highway 766. The replacement structure is expected to be a 2.0 m diameter CSP culvert along a new alignment. The construction completion date will be October 31, 2024. BF 81912 carries TR 282 over a drainage near Madden. The crossing provides access to Highway 772 for a number of local landowners and agricultural facilities. The replacement structure is expected to be a non-bridge-sized CSP culvert (< 1.2 m diameter) though this structure is not confirmed at this point in time. The construction completion date will be October 31, 2024. BF 13177 carries TR 264 over a tributary to Crossfield Creek, near Kathryn. The crossing provides access throughout the northeast portion of the county. The replacement structure is expected to be a polymer-laminated 2.4 m CSP culvert complete with substrate and holders. The construction completion date will be October 31, 2024. It is anticipated that BF 81912 will be tendered with BF 8668 due to the close vicinity. All other sites are anticipated to be tendered separately. Question Deadline 03/15/2024 at 2:00 PM MT
Post-Bid
Bridges / Tunnels
$1,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
August 1, 2024
Multiple Locations, Crossfield, AB
Related To This Project
Crossfield, AB
--
Crossfield, AB
Bid Date: May 24 2024
Crossfield, AB
Bid Date: Oct 31 2024
Crossfield, AB
Bid Date: Feb 20 2025
Crossfield, AB
Bid Date: Apr 24 2025
Crossfield, AB
Bid Date: Mar 27 2025
Crossfield, AB
--
Crossfield, AB
Bid Date: May 01 2025
Crossfield, AB
Bid Date: Feb 21 2024
Crossfield, AB
--
Crossfield, AB
--
Crossfield, AB
Bid Date: Feb 08 2022
Crossfield, AB
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
